Published April 13, 2022 at 8:00 PM

Updated October 1, 2024

Renovation of an educational facility in Lincolnwood, Illinois. Completed plans call for the renovation of a educational facility.

The Project consists of mechanical and electrical renovations, exterior soffit renovations, and glazing replacement at Todd Hall, 3925 W. Lunt Avenue and Rutledge Hall, 6850 N. East Prairie Road, Lincolnwood, IL, for Lincolnwood School District 74, hereafter called the Owner, and is to be constructed in accordance with the Contract Documents prepared by StudioGC, dated January 18, 2022. B. Scope: The Work includes the work of all trades required; and all the labor, Each bid must be accompanied by a Bid Guarantee in the form of a Bid Bond, Certified Check or Bank Draft in an amount equal to and not less than ten percent (10%) of the bid and made payable to Board of Education, Lincolnwood School District 74, Lincolnwood, IL. No bid shall be withdrawn for a period of sixty (60) days after the bid opening date without the consent of the Owner. Checks or drafts of unsuccessful Bidders will be returned as soon as practical, after opening and checking the bids. Successful Bidder must provide a Performance Bond and a Labor and Material Payment Bond in the full amount of the Contract, acceptable to the Owner. The Board of Education reserves the right to reject any or all bids or parts thereof or waive any irregularities or informalities in bidding. This Contract is subject to the Illinois Prevailing Wage Act (820 ILCS 130/1 et seq.). Each Bidder must satisfactorily complete the qualification process described in Section 004395 -General Requirements of the Project Manual, by providing the required Qualification Documents. The required Qualification Documents must be delivered along with the Bidder sealed bid at the same place and time required for the bid. Contents of each Bidder's Qualification Documents will be available for public review. The Qualification Documents will be reviewed by the Owner and Architect to determine the lowest responsible Bidder. Non-attendance can be grounds for rejection of bid. Tentative Commencement of Work on Site: June 20, 2022 Todd Hall mechanical unit crane operations for demolition and new installation to occur between June 27, 2022 and July 8, 2022. C. Substantial Completion: July 29, 2022 D. Final Completion: August 5, 2022 LINCOLN HALL: 6855 N CRAWFORD AVE LINCOLNWOOD, IL 60712 TODD HALL: 3925 W. LUNT AVE LINCOLNWOOD, IL 60712 RUTLEDGE HALL: 6850 E. PRAIRIE RD LINCOLNWOOD, IL 60712

Award

Educational

$630,000.00

Public - City

Renovation

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Contingency Allowances, Contract Modification Procedures, Payment Procedures, Schedule of Values, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Control, Testing and Inspecting Services, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Final Cleaning, Closeout Procedures, Closeout Submittals, Project Record Documents, Commissioning
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry
Division 05 - Metals

Division 05 - Metals

Cold-Formed Metal Framing, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Thermal Protection, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Ceilings, Flooring, Terrazzo Flooring, Carpeting, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, HVAC Piping Insulation, Instrumentation and Control for HVAC, Sequence of Operations for HVAC Controls, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, HVAC Fans, Central HVAC Equipment, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Fan Coil Units, Unit Heaters
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Identification for Electrical Systems, Low-Voltage Electrical Distribution, Electrical and Cathodic Protection, Facility Lightning Protection, Lighting, Interior Lighting, Emergency Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 33 - Utilities

Division 33 - Utilities

Utilities

Find More Local Projects

Within 75 Miles of This Project
304
Active Projects
204
Bidding Soon
2,403
All Active Projects
1,147
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 4, 2022

June 20, 2022

img_map_placeholder

Multiple Locations, Lincolnwood, IL

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

2022 General Work Todd Hall and Rutledge Hall

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.