Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a mixed-use development in Mississippi State, Mississippi. Completed plans call for the renovation of a educational facility.
21029 SCOPE OF WORK A. Prior to beginning work, survey existing electrical systems. Document, in writing, signed by the Owner any portions of existing systems that are not operating properly before construction begins. Any electrical systems found inoperable at the end of the construction process that has not been so documented shall be repaired at the end of construction. B. Remove electrical equipment in areas being demolished, and electrical equipment feeding other equipment being demolished. Remove raceways and circuitry back to the panel of origination. Where raceways are installed in inaccessible areas, remove conductors back to the panel of origination. Where circuits are not being completely demolished, remove conductors back to a junction box or other connection point outside of the renovated area and recircuit existing electrical equipment that is to remain as required. Where necessary, completely refeed existing electrical equipment that is to remain. It is the intent of this specification that all existing equipment to remain be left completely operable at the end of the construction process. C. Survey existing panelboard circuitry and provide new typewritten directories giving complete as-built circuitry information for all panelboards affected by the construction on this project. D. Where new circuit breakers are installed in existing equipment, the new circuit breakers shall be manufactured for installation in that equipment. The Amperes Interrupting Current (AIC) Rating shall equal the AIC rating of the existing equipment. A breaker with a lower AIC rating may be used if the contractor provides calculations showing that the breaker rating is sufficient to handle the available fault current. Submit these calculations for approval prior to ordering the breaker. An AIC rating on an existing breaker in the panelboard or switchboard does not demonstrate sufficient proof that the available fault current is less than that breaker's AIC rating.
Post-Bid
Educational
$250,000.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 16, 2022
March 18, 2022
Lakeview Dr, Mississippi State, MS
Related To This Project
Mississippi State, MS
Bid Date: Feb 08 2022
Mississippi State, MS
Bid Date: Mar 02 2022
Mississippi State, MS
Bid Date: Mar 16 2022
Mississippi State, MS
--
Mississippi State, MS
Bid Date: Apr 05 2022
Mississippi State, MS
Bid Date: Apr 05 2022
Mississippi State, MS
Bid Date: Apr 05 2022
Mississippi State, MS
Bid Date: Apr 05 2022
Mississippi State, MS
Bid Date: Feb 22 2022
Mississippi State, MS
Bid Date: Feb 23 2022
Mississippi State, MS
Bid Date: Dec 14 2021
Mississippi State, MS
Bid Date: Jan 25 2022
Mississippi State, MS
Bid Date: Jan 27 2022
Mississippi State, MS
Bid Date: Jan 13 2022
Mississippi State, MS
Bid Date: Jan 13 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.