BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of an educational facility in La Motte, Quebec. Completed plans call for the construction of a 13,068-square-foot, one-story above grade, three-room educational facility; and for site work for a educational facility.

Reference number : 1832533 Deadline for receiving complaints: 2024-04-29 Electronically transmitted submission accepted: Yes, via the SEAO, with a document Expected duration of the contract without options (in months): 18 The Harricana School Service Center wants to build a new school on virgin land in the village of La Motte. It is a 1101 m2 school which will have 3 classes, a large multi-purpose room and a 210 m2 gymnasium . The entire work will be on a slab on ground with a steel structure. Exposed wooden girts are planned for the gymnasium. The roofs will be sloping with two sides. The exterior finish will be brick. It is a school which will be ventilated, air-conditioned and heated using heat pumps. Electric baseboards at the bottom of the windows will supplement the heating. All lighting will be LED type with time delay control. The school will be equipped with access control, cameras, an intercom, an intrusion alarm system and a distributed control system for remote control of several parameters. It's a country school, so the water will come from a new well already drilled. The drinking water treatment system is included in the project, however. Also included in the project will be a wastewater treatment system. A landscape architect defined all the exterior design. Note that the only asphalt surface of the project will be for the basketball court, everything else, including the access path will be finished in stone dust. A fence will be installed around the facilities. Note that the demolition of the old school is not included in the current contract.

Bid Results

Educational

$10,268,000.00

Public - State/Provincial

New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
9
Active Projects
4
Bidding Soon
71
All Active Projects
24
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 29, 2024

July 22, 2024

img_map_placeholder

359 Chem. Saint-Luc, La Motte, QC

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.