Published March 31, 2022 at 8:00 PM

Updated September 15, 2023

Demolition, site work, renovation and addition to an educational facility in Stony Mountain, Manitoba. Completed plans call for the addition of a 6,281-square-foot, two-story above grade educational facility; for the demolition of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.

The project consists of a two story 6,281 square foot (583.5 square meter) 10 classroom addition to Waterford Springs Elementary School in northwest Winnipeg, Manitoba. The building structure will include concrete grade beams on concrete piles, precast concrete hollow core floor planks, insulated concrete block bearing walls, and a steel framed roof system. The lower exterior finish of the classroom addition will consist of tyndall stone veneer with ceramic brick veneer features to match existing school building. The upper exterior finish will consist of prefinished steel wall cladding to match existing school building. Demolition of existing building elements will be required to accommodate tie-ins to new construction. Exterior site work will match existing landscaping features. Bidders can view/download Contract Documents or arrange for a file transfer of the Contract Documents in PDF format from the Winnipeg School Division website at www.winnipegsd.ca or the following Construction Information Services: .1 Condata Plan Room www.condata.ca/planroom .2 MERX Canadian Public Tenders www.merx.com .3 Winnipeg Construction Association www.winnipegconstruction.ca Bids shall be accompanied by a bid bond in the amount of 10% of the bid price. Bidders must conform to Winnipeg School Division Bonding and Insurance Requirements. Perform Work during the period from March 15, 2022 to July 31, 2023. Substantial Performance of the Work to be completed no later than Monday July 3, 2023. The Contractor shall within seven (7) calendar days of written notice, provide to the Owner a Performance Bond and, Labour and Material Payment Bond for 50% of the Contract Price. If you have any questions or concerns in regards to the following, please contact Brent Mehyden, Engineering Manager. 204-786-0337 or bmehyden@wsd1.org

Award

Educational

$5,072,787.00

Public - State/Provincial

Addition, Demolition, Renovation, Site Work

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Cash Allowances, Administrative Requirements, Construction Progress Documentation, Scheduling of Work, Submittal Procedures, Certificates, Design Data, Special Procedures, Quality Requirements, Regulatory Requirements, Quality Assurance, Manufacturer Qualifications, Installer Qualifications, Manufacturer?s Field Services, Temporary Facilities and Controls, Construction Facilities, Sanitary Facilities, Temporary Controls, Temporary Erosion and Sediment Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Progress Cleaning, Final Cleaning, Closeout Submittals, Bonds, Project Record Documents, Extra Stock Materials, Commissioning
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Architectural Concrete, Concrete Finishing, Concrete Curing, Precast Concrete, Precast Structural Concrete, Precast Concrete Specialties
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Joists, Steel Joist Framing, Metal Decking, Steel Decking, Cold-Formed Metal Framing, Metal Fabrications, Metal Stairs, Metal Ladders, Metal Railings
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Wood, Plastics, and Composites, Common Work Results for Wood, Plastics, and Composites, Rough Carpentry, Sheathing, Shop-Fabricated Structural Wood, Finish Carpentry, Millwork, Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Dampproofing, Thermal Protection, Thermal Insulation, Steep Slope Roofing, Natural Roof Coverings, Roofing and Siding Panels, Metal Wall Panels, Membrane Roofing, Flashing and Sheet Metal, Sheet Metal Flashing and Trim, Fire and Smoke Protection, Firestopping, Smoke Seals, Joint Protection, Preformed Joint Seals, Joint Sealants, Acoustical Joint Sealants, Expansion Control, Expansion Joint Cover Assemblies
Division 08 - Openings

Division 08 - Openings

Openings, Doors and Frames, Metal Doors and Frames, Hollow Metal Doors and Frames, Wood Doors, Windows, Composite Windows, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Metal Furring, Suspension Systems, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Resilient Sheet Flooring, Carpeting, Acoustic Treatment, Acoustic Wall Coating, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Visual Display Surfaces, Markerboards, Tackboards, Signage, Interior Specialties, Partitions, Toilet, Bath, and Laundry Accessories, Storage Specialties, Lockers, Metal Lockers, Exterior Specialties, Protective Covers
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings, Common Work Results for Furnishings, Fabrics, Window Treatments, Window Shades, Roller Window Shades, Casework, Countertops, Furnishings and Accessories, Portable Lamps, Lamps, Rugs and Mats, Runners, Furniture, Seating, Chairs, Residential Furniture, Beds, Other Furnishings, Site Furnishings
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Facility Storm Drainage, Roof Drains, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, Pneumatic and Electric Control System for HVAC, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, HVAC Fans, Air Outlets and Inlets, Central HVAC Equipment, Indoor Central-Station Air-Handling Units, Custom Indoor Central-Station Air-Handling Units, Decentralized HVAC Equipment, Convection Heating and Cooling Units
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of Electrical Systems
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Hangers and Supports for Electrical Systems, Raceway and Boxes for Electrical Systems, Cable Trays for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Circuit Protective Devices, Fuses, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Common Work Results for Communications, Pathways for Communications Systems, Voice Communications, Audio-Video Communications, Audio-Video Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Rough Grading, Excavation and Fill, Excavation, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Base Courses, Aggregate Base Courses, Rigid Paving, Concrete Paving, Unit Paving, Stone Paving, Aggregate Surfacing, Crushed Stone Surfacing, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Planting Preparation, Turf and Grasses, Sodding, Plants, Shrubs, Trees, Planting Accessories, Planters
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Public Storm Utility Drainage Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration, Instrumentation and Control for Process Systems, Process Control Auxiliary Devices
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Feeders, Feeders, Piece Material Handling Equipment, Lifting Devices, Slings, Manufacturing Equipment, Assembly and Testing Equipment, Applicators
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
34
Active Projects
29
Bidding Soon
296
All Active Projects
146
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 9, 2022

March 14, 2022

img_map_placeholder

2090 Jefferson Ave, Stony Mountain, MB