BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 8, 2022 at 7:00 PM

Updated November 15, 2023

Site work and paving for a mixed-use development in Dallas, Georgia. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The OWNER is not obligated to consider a BIDDER’S proposal, if BIDDER is not on record with the Issuing Office as having received complete Bidding Documents from the Issuing Office The approximate extent and character of the Work will be performed within the limits of the Mulberry Rock Park Phase II and is generally described as follows: 1. Extension of an existing roadway to connect and create a loop road throughout the park 2. Proposed storm Culverts and roadway storm network work 3. Proposed sidewalk and trail work 4. Site grading 5. Water line installation 6. Erosion and Sediment Control Each BID must be accompanied by a Bid Bond with good and sufficient surety or sureties approved by the owner for faithful acceptance of the contract, payable to, in favor of, and for the protection of the OWNER in an amount equivalent to five percent (5%) of the total amount payable by the terms of the contract or, in lieu thereof, in the form of a certified check, cashier's check, or cash in equal amount. The Successful BIDDER will be required to furnish performance and payment bonds with the executed Agreement meeting the requirements of the Contract Documents, each in the amount of one hundred percent (100%) of the BID. The overall time allowed for Substantial Completion for the total project is 240 calendar days, and the time allowed for completion and readiness for final payment is 270 calendar days from the date of Notice to Proceed. This project will be constructed in one phase. The OWNER reserves the right to reject any or all BIDS, to waive formalities and re-advertise.

Award

Roads / Highways

$1,675,330.00

Public - County

Paving, Site Work

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
308
Active Projects
198
Bidding Soon
2,224
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 17, 2022

March 21, 2022

Project location map

To Be Determined, Dallas, GA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.