Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Dothan, Alabama. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
This bracket range is shown only to provide general financial information to contractors and bonding companies concerning the project's complexity and size. This bracket should not be used in preparing a bid, nor will this bracket have any bearing on the decision to award the contract. U.S. Highway 84/East Main St. Pedestrian Sidewalk Project: 5-foot and 10-foot sidewalk segments approximately 2,000 feet long and 4 inches thick from approximately 900 feet west of the Ross Clark Circle to approximately 1,100 feet east of the Ross Clark Circle, including intersection crosswalks. The principal items of work are approximately as follows: 1 lump sum of mobilization 1 lump sum of clearing and grubbing 549 cubic yards of unclassified excavation 3,110 square feet of retaining wall (modular block wall) 1,768 square yards of concrete sidewalk (4" thick) 560 square yards of solid sodding (bermuda) 800 linear feet of silt fence 1,626 square feet of traffic control markings, class 2, type a the entire project shall be completed in ninety (90) working days. To be eligible for consideration, bids must be submitted on complete original proposals made available by the city or engineer. No bid documents will be distributed later than 24 hours prior to the scheduled opening of bids. In accordance with section 34-8-8 code of alabama as amended, "All owners, architects, and engineers receiving bids pursuant to this chapter shall require the person, firm or corporation to include his or her current license number on the bid." It also states that " it will be necessary for him or her to show evidence of license before his or her bid is considered." Prequalification is not required on this project. Further details and definitions regarding this provision are included in section 102 of special provision 18-lpa3 and aldot's standard specifications. Proof of insurance coverages of the types and amounts as set forth in the project specifications will be required of the contractor, and any and all subcontractors, prior to beginning work. The contractor will be required to perform work amounting to at least 30% of the total contract cost with his own organization. This is a federally funded project through aldot. The proposed work shall be performed in conformity with all applicable laws, rules and regulations. The right to reject any or all bids is reserved.
Bid Results
Sidewalks / Parking Lot
$470,187.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 8, 2022
March 10, 2022
Multiple Locations, Dothan, AL
Related To This Project
Dothan, AL
Bid Date: Jun 22 2021
Dothan, AL
Bid Date: Jul 27 2021
Dothan, AL
Bid Date: Jul 27 2021
Dothan, AL
Bid Date: Sep 28 2021
Dothan, AL
Bid Date: Sep 21 2021
Dothan, AL
Bid Date: Sep 16 2021
Dothan, AL
Bid Date: Jul 27 2021
Dothan, AL
Bid Date: Sep 16 2021
Dothan, AL
Bid Date: May 24 2022
Dothan, AL
Bid Date: Jun 28 2022
Dothan, AL
Bid Date: Apr 12 2022
Dothan, AL
Bid Date: Apr 19 2022
Dothan, AL
Bid Date: Jul 12 2022
Dothan, AL
Bid Date: Jun 07 2022
Dothan, AL
Bid Date: Jun 21 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.