BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of a mixed-use development in Freeport, Illinois. Completed plans call for the renovation of a educational facility; and laboratory facility.

PRE-BID SITE VISIT: Contractors are required to survey the existing conditions prior to bidding. ACCESS TO BIDDING Bidding Documents are on file for reference at the DOCUMENTS: following locations: Office of the Architect Rockford, IL NIBCA (N. Ill. Bldg. Contractors Assn). Rockford, IL Bidding Documents may be secured from the office of the Architect. BID FORM: Bids shall be submitted in duplicate on forms included in the specifications by the Architect. BID SECURITY: Bids shall be accompanied by a Bid Security of at least 5% of the total amount of the base bid and all additive alternate bids. This may be in the form of a certified check, cashier's check, bank draft, or bid bond, payable to the Owner as a guarantee that the bidder will enter into a contract with the Owner and will furnish the proper performance and payment bond within the time limited by the Owner. If the successful bidder so files the contract and performance and payment bond, upon the execution of the contract by the Owner, the Bid Security will be returned to all bidders. If he/she fails to file such contract and performance and payment bond the amount of the Bid Security will be forfeited to the Owner as liquidated damages. PERFORMANCE BOND: A performance and payment bond for the full amount of the Contract will be required of the successful bidder. All costs associated with the bond shall be included in the bid amount. WAGE RULES: The general prevailing rate of wages in the locality in which the work is to be performed for each craft or type of worker or mechanic needed to execute the contract will adhere to all Federal Laws and Laws of the State, and to all local ordinances and regulations applicable to the work hereunder, and having force of law. RIGHTS RESERVED The Owner reserves the right to waive any irregularities and/or. BY OWNER: reject any or all bids when, in the opinion of the Owner, such action will serve the best interests of the Owner. WITHDRAWAL OF No bid may be withdrawn for a period of sixty (60) days after BIDS: the opening of bids without written consent of the Owner.

Award

Laboratories

$440,000.00

Public - City

Renovation

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
98
Active Projects
58
Bidding Soon
938
All Active Projects
444
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 8, 2022

March 10, 2022

img_map_placeholder

2998 W Pearl City Rd, Freeport, IL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.