BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Hartland Township, Michigan. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

As of January 4, 2023, construction is completed. Construction took place from March 7, 2022 through August 5, 2022. Project Quantities: 23,560 Cyds Earth Excavation, 6,740 Cyds Embankment, 6,343 Cyds Subbase, 12,271 Tons Agg Base, 5,143 Ft Conc, Curb and Gutter, 10,812 Tons HMA, 2,390 Ft Cl E Sewer, 11,037 Ft Subbase Underdrain, 82,340 Ft Pavement Marking, 19,700 Syd Slope Restoration. Includes 1.12 miles of road reconstruction and HMA paving and 0.93 miles of pavement rehabilitation and HMA paving on Crooked Lake Road from Latson Road to Dorr Road in Genoa Township, Livingston County, Michigan The entire completed and signed proposal must be submitted in sealed envelope bearing the name of the bidder and a notation indicating the project on which bid is submitted. A certified or cashier's check on an open solvent bank shall be submitted with each individual bid in the amount of $50,000.00 payable to the Livingston County Road Commission. Work shall not commence from the POB to Station 19+00 (Three Fires Elementary School driveway) prior to June 2, 2022. Work from the POB to Station 19+00 must be completed by the interim completion date of August 17, 2022. The project must be completely open to traffic by the open to traffic date of October 28, 2022. The entire project must be completed by the final completion date of November 15, 2022. All work to be accomplished shall be under the direct supervision of the County Engineer or his authorized representative. It is expressly understood that any approvals, reviews, and inspections of any nature by the Livingston County Road Commission, its agents, officers, and employees, shall not be construed as a warranty or assumption of liability on the part of the Livingston County Road Commission. Any such approvals are for the sole and exclusive purposes of the Livingston County Road Commission, which is acting in a governmental capacity under this contract. Any approvals, reviews, and inspections by the Livingston County Road Commission will not relieve the Contractor of the Contractors obligations hereunder, nor are such approvals, reviews, and inspections to be construed as a warranty as to the propriety of the Contractors performance, but are undertaken for the sole use and information of the Livingston County Road Commission *This project has been awarded and all trades have been let.

Occupancy

Roads / Highways

$3,343,077.00

Public - County

Paving, Site Work

103

6

2

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
345
Active Projects
191
Bidding Soon
2,731
All Active Projects
1,070
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 8, 2022

March 7, 2022

August 5, 2022

img_map_placeholder

Crooked Lake Rd, Hartland Township, MI


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.