BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a bridge / tunnel in Louisville, Kentucky. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Contract Award Date: Mar 16, 2022 Contract Award Number: W912QR21D0028 Task/Delivery Order Number: W912QR22F0105 Contractor Awarded Unique Entity ID: Contractor Awarded Name: N O R TH W I N D -C O R N E R S TO N E J O I N T V E N TU R E L L C Contractor Awarded Address: Louisville, KY 40212 USA Base and All Options Value (Total Contract Value): $199469.00 This action is set-aside 100% for the members of USACE HubZone MATOC pool (Contract Numbers: W912QR21D0028 through W912QR21D0034). Only the MATOC contract holders of the above-mentioned contracts are able to submit proposals for this action. The contractor shall repair the damaged bridge at McAlpine Locks and Dam per design drawings and scope of work attached to this solicitation. ***Amendment 0001*** The following requirements are removed from the Scope of Work: o 1.5.3.3 Contractor Qualifications (SOW page 93) o SD-07 Certificates (SOW page 109) Updated SOW is attached. All other terms and conditions remain unchanged ***Amendment 0001*** ***Amendment 0002*** The following traffic notes have been added to page 3 of "MCA BRIDGE REPAIR_Drawings" Lock Traffic Notes: Lock Closure Requirements: The contractor must provide a request for closure with a 7-day notice. After award, contractor will provide a project schedule that will help USACE plan for the upcoming closures. The restrictions on closing the south chamber are that the contractor may work up to 12 hours during daylight hours only. The contractor must not close the chamber more than 5 consecutive days. IF the lower gage of the Ohio River at McAlpine is above 27 feet, the contractor will have no restriction on consecutive days for closure on the south chamber. General Work Requirements: All work on the damaged bridge section must stop when river traffic is passing underneath. Contractor can submit a plan to protect passing traffic underneath, but the plan will have to be approved by USACE. Proposal due date has been changed from 10:00 a.m. ET on 28 January 2022 to 10:00 a.m. ET on 02 February 2022. All other terms and conditions remain unchanged. ***Amendment 0002*** P2 128624 FY21

Award

Bridges / Tunnels

$199,469.00

Public - Federal

Paving, Site Work

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
91
Active Projects
59
Bidding Soon
979
All Active Projects
396
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 2, 2022

March 3, 2022

img_map_placeholder

To Be Determined, Louisville, KY

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.