BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 26, 2022 at 7:00 PM

Updated November 15, 2023

Renovation of a detention facility in Moberly, Missouri. Completed plans call for the renovation of a detention facility.

The project includes furnishing all labor, materials, equipment and services to remove and replace the roof system, including repair and replacement of deteriorated roof deck, new insulation, flashings, trims, fasteners, roof accessories and all other components required to make a complete weathertight installation of the Metal Plant Building No. 12. MBE 10%, WBE 10%, and SDVE 3%. Designer: Connell Architecture, P.C., Brian Connell, (573) 268-6166, email: brian.connell@connellarchitecture.com Project Manager: Scott Zeller, (573) 751-2668, email: Scott.Zeller@oa.mo.gov The State reserves the right to reject any and all bids and to waive all informalities in bids. No bid may be withdrawn for a period of 20 working days subsequent to the specified bid opening time. The contractor shall pay not less than the prevailing hourly rate of wages for work of a similar character in the locality in which the work is performed, as determined by the Missouri Department of Labor and Industrial Relations and as set out in the detailed plans and specifications. The deadline for submission of technical questions to Connell Architecture is Tuesday, February 1, 2022 at 12 pm

Award

Jails / Prisons

$576,109.00

Public - State/Provincial

Renovation

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 10, 2022

March 14, 2022

Project location map

5201 S Morley St, Moberly, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.