BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a detention facility in Moberly, Missouri. Completed plans call for the renovation of a detention facility.

The project includes furnishing all labor, materials, equipment and services to remove and replace the roof system, including repair and replacement of deteriorated roof deck, new insulation, flashings, trims, fasteners, roof accessories and all other components required to make a complete weathertight installation of the Metal Plant Building No. 12. MBE 10%, WBE 10%, and SDVE 3%. Designer: Connell Architecture, P.C., Brian Connell, (573) 268-6166, email: brian.connell@connellarchitecture.com Project Manager: Scott Zeller, (573) 751-2668, email: Scott.Zeller@oa.mo.gov The State reserves the right to reject any and all bids and to waive all informalities in bids. No bid may be withdrawn for a period of 20 working days subsequent to the specified bid opening time. The contractor shall pay not less than the prevailing hourly rate of wages for work of a similar character in the locality in which the work is performed, as determined by the Missouri Department of Labor and Industrial Relations and as set out in the detailed plans and specifications. The deadline for submission of technical questions to Connell Architecture is Tuesday, February 1, 2022 at 12 pm

Award

Jails / Prisons

$576,109.00

Public - State/Provincial

Renovation

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
40
Bidding Soon
353
All Active Projects
147
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 10, 2022

March 14, 2022

img_map_placeholder

5201 S Morley St, Moberly, MO

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.