BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a clubhouse / community center in Leavenworth, Kansas. Completed plans call for the renovation of a clubhouse / community center.

Project is for work at the Riverfront Community Center located at 123 S. Esplanade St. in Leavenworth, KS. Direct all questions to Steve Grant, Director of Parks and Recreation, at SGrant@firstcity.org REPLACEMENT OF EXISTING COOLING TOWERS Disconnect, remove and dispose of (2) existing cooling towers, wiring, pump, strainers, & exterior piping. Modify existing structural support steel to accommodate new tower(s). Replace towers with (2) Baltimore Aircoil # PT2-0709A, or equivalent, 166 Nominal ton galvanized towers, with stainless steel basin, EVERTOUGH corrosion resistance coating. One single (2) cell cooling tower is acceptable. Reconfigure existing condenser system makeup water including materials as needed to accommodate new tower(s). Reconfigure existing tower supply and return water including materials to accommodate new tower(s).. Reconfigure existing power wiring including materials to accommodate nswtower(s). Make all connections, fill system and test operation. Balance water flow as needed for naw tower(s). Vsrify proper operation and maximum output of new tower(s). Provide owner operation and routine maintenance training. Provide minimum one year parts and labor warranty for all material and labor supplied and installed. ADDITION OF SECONDARY (AUXILIARY) TOWER WATER PUMP Layout and dig pump base pad footing for new pump, Footing must be below frost line. Pour footing and pad for new pump. Install new Taco Model #4011D 20.0 horsepower vertical inline split coupled pump, or equivalent, on pad Reconfigure existing watertower piping to accommodate second pump & connect both pumps. Reconfigure existing power wiring to accommodate both pumps & connect to new pump starter. New and existing pumps to require manual energization to operation. Pumps to run simultaneously. Test operation of new pump A balance to proper flow.

Post-Bid

Clubhouse / Community Centers

$110,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
63
Active Projects
31
Bidding Soon
760
All Active Projects
292
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 16, 2022

March 18, 2022

img_map_placeholder

123 S Esplanade St, Leavenworth, KS

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.