BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Millersport, Ohio. Completed plans call for the renovation of a educational facility.

all labor, material, and services necessary for the HVAC Improvements for Walnut Township Local Schools as described in the Contract Documents prepared by Schorr Architects, Inc. Direct all questions to sar@schorrarchitects.com. All bids must be accompanied by a completed Bid Form and completed Bid Guaranty Contract Bond Form as described in the Instructions to Bidders. No Bidder may withdraw its bid within sixty (60) days after the bid opening. The Board of Education reserves the right to waive irregularities in bids, to reject any or all bids, and to conduct such investigation as necessary to determine the responsibility of a bidder. Construction Commencement May 31, 2022 Substantial Completion July 22, 2022 Final Completion of Work August 5, 2022 a Contract Bond in the form Contract Bond included in the Bid Documents in an amount equal to 100% of the Contract Sum a certified check, cashiers check, or irrevocable letter of credit in an amount equal to 10% of the bid. The Project consists of all labor, materials, equipment, and services necessary for the proper completion of the HVAC Improvements at Millersport Junior/Senior High School and Millersport Elementary School (referred to as the "Project"), all in accordance with the Drawings and Specifications prepared by the Design Professional. The work for which bids are solicited for the Project will be completed sixty days from the date of execution of the contract with the successful bidder, or as detailed in the schedule information included with the Contract Documents. Project Location: Millersport Elementary School and Millersport Junior/Senior High School, 11850 Lancaster Street, Millersport, Ohio 43046 estimate cost “1. Base Bid - $460,000.00 2. Alternate 1 - $216,000.00 3. Alternate 2 - $165,800.00”

Bid Results

Educational

$472,000.00

Public - City

Renovation

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
169
Active Projects
86
Bidding Soon
2,079
All Active Projects
881
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 2, 2022

May 31, 2022

August 5, 2022

img_map_placeholder

11850 Lancaster St, Millersport, OH

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.