EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 15, 2022 at 7:00 PM

Updated October 1, 2024

Renovation of an educational facility in Saint Cloud, Minnesota. Completed plans call for the renovation of a educational facility.

The project calls for the replacement of the existing built-up roof system with new gravel surfaced built-up roof. The work will also include roof decking replacement. All work on top of the mechanical penthouse located on top of G Wing. SCTCC-21-G Wing Penthouse Roof Replacement 1540 Northway Drive St. Cloud, MN 56303 WBE (12%) A. Prior to removal of existing roof system, provide all necessary protection for Owner's equipment and personnel. B. Remove debris and loose gravel (if present) from roof area and properly dispose of all materials off-site. C. Tear off existing roof membrane, base flashings, insulation material, vapor retarder and existing roof deck and properly dispose of off-site. D. Ensure that all drains are in proper working order and that drain lines are clear to the first elbow. E. At insulation replacement areas, remove the existing roof system where marked on the roof to the surface of the existing vapor retarder. Deck Repair/Replacement: A. Remove obsolete roof penetrations (verified by facility personnel.) B. Remove and replace the existing steel decking throughout the entire roof area.. Rough Carpentry: A. Install nailers, where required, to match height of new insulation, as detailed. B. Install nailers for curb extensions, as required, for minimum curb height of 12" above new membrane. Sheet Metal/Flashings: A. Install new 24-gauge, pre-finished sheet metal counterflashings at curbs and perimeter locations. B. Install 24-gauge, pre-finished sheet metal on expansion and control joints where indicated on detail drawings. C. Install 24-gauge, galvanized accessories where shown on detail drawings Work shall commence after April 1, 2022, and substantial completion shall be achieved within the contract roof working days and by May 31, 2022.

Award

Educational

$155,700.00

Public - City

Renovation

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
119
Active Projects
61
Bidding Soon
779
All Active Projects
404
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 8, 2022

April 1, 2022

img_map_placeholder

1540 Northway Dr, Saint Cloud, MN


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.