BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 13, 2022 at 7:00 PM

Updated November 15, 2023

Site work and paving for a road / highway in Davenport, Iowa. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The proposed work includes all labor, materials, tools, supplies, utility and transportation services, equipment and all incidentals necessary for the Pacific Street Overlay (68th Street To 70th Street) Project and Work For all bids over $100,000, the City of Davenport requires a Bid Bond of 5% of the bid amount. A copy of the front page of the bid bond must be attached in the "Response Attachments" tab of the bid package. Bids over $100,000, submitted without a bid bond will not be considered. For awarded bids over $100,000, the awarded contractor will be required to furnish a Performance Bond in an amount equal to one hundred percent (100%) of the Contract amount, and said bond to be issued by a responsible surety approved by the City and shall guarantee the faithful performance of the Contract and the terms and conditions therein contained. Working Days - The contract time shall be per SUDAS Section 1080-1.02, A.3.a, Specified Start Date. The contract site is currently available. It is anticipated that the contract will be awarded on the 23rd of February and executed by the 2nd of March. The Notice to Proceed will be issued as soon as the contract is executed by the City. The specified start date set by the Notice to Proceed will be approximately two weeks from the date of the Notice. The contractor shall begin construction on or before the date specified and complete all work, including final cleanup and removal of all equipment within 30 working days. The City reserves the right to reject any or all bids and to waive technicalities and irregularities, if it is deemed in the public interest to do so. The work includes the furnishing of all labor, materials, equipment and services necessary for HMA overlay including but not limited to survey, subgrade patching, HMA pavement, driveway approaches and seeding. The quantities herein represent the Engineer's estimate of the amount of work to be completed. Actual as-built quantities may vary from bid quantities. The contractor shall begin construction on or before the date specified and complete all work, including final cleanup and removal of all equipment within 30 working days. Liquidated damages shall be $300 per day.

Award

Roads / Highways

$123,980.00

Public - City

Paving, Site Work

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
144
Active Projects
87
Bidding Soon
1,118
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 8, 2022

March 10, 2022

Project location map

Pacific St, Davenport, IA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.