BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Portage, Michigan. Completed plans call for the renovation of a educational facility.

The Board will not accept a bid proposal that does not include a sworn and notarized familial disclosure statement disclosing any familial relationship that exists between the owner or an employee of the bidder and any employee of the Portage Public School District or member of the Board of Education. The Board of Education reserves the right to accept or reject any or all bids, either in whole or in part; to award contract to other than low bidder; to waive any irregularities and/or informalities; and in general to make awards in any manner deemed to be in the best interest of Portage Public Schools. *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com. and or procedures guidelines. b. Pre-cleaning the floor with a water-based cleaner such as Hillyard Super Shine All or Tack It recommended by the finish manufacturer. c. Dry screening the floor with 120-grit screens (at a rate of 250 2/side of screen) using a dust collecng device aached to the floor machine. i. Please note that there is very lile finish on the CMS and NMS gym floors. Proper precauons should be taken and noted, as to not damage the exisng paint. d. Remove all dust through vacuuming the enre floor surface surrounding areas, corners, edges, etc. e. Tack the floor using Hillyard Tack It, Kleen up Solvent or a comparable product unl the floor is free of all dust and debris. f. Apply 1 coat of gym floor finish that is an MFMA approved oil-modified urethane wood floor finish with an applicator recommended by the finish manufacturer. Gym floor finish should be Hillyard 450 Gym Finish or a comparable product (for both playability and durability) g. Allow the floor to cure properly to accept a second coat of gym floor finish. h. Prepare the floor for the second coat of finish by abrading the floor with maroon pads or the manufacturer recommended pad system. i. Vacuum and tack the floor with Hillyard Tack-It, Kleen Up Solvent or a comparable product to remove all dust and debris from the floor surface. j. Apply 1 coat of gym floor finish that is an MFMA approved oil-modified urethane wood floor finish with an applicator recommended by the finish manufacturer. Gym floor finish should be Hillyard 450 Gym Finish or a comparable product (for both playability and durability)

Bid Results

Educational

$30,921.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
173
Active Projects
108
Bidding Soon
1,414
All Active Projects
519
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 1, 2022

June 24, 2022

August 13, 2022

img_map_placeholder

Multiple Locations, Portage, MI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.