Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 23, 2023 at 8:00 PM
Updated January 29, 2024
Demolition, site work, paving and new construction of a bridge / tunnel in Schroeder, Minnesota. Working plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
The Ontario Ministry of Transportation (MTO) is preparing plans for a Highway 61 Pier Repair Project at the Pigeon River Bridge. MTO plans to let the project in January of 2024, with work scheduled to begin in June of 2024. The Project will include pier repair both above and below the water level of the Pigeon River. This Work will include removal of deteriorated material and construction of repairs as noted in the provided details. _______________________________________________________________________________________________ Federal gov't pledges $60M for Minnesota bridges, more in the coming years Bridges around Minnesota will undergo repairs with a $60 million boost in federal transportation money headed this way and more in the years ahead. Federal highway officials released the first award amounts Friday that will come from newly approved infrastructure spending. The money will go toward fixing or replacing state and local bridges. U.S. Sen. Amy Klobuchar said in a press conference that the infusion will make a difference. "I think no state knows better than Minnesota how important it is to have safe and reliable bridges," she said. "I remember the cracks in their broken transportation system became tragically clear on August 1, 2007, when the 35W bridge collapsed in the middle of the Mississippi River." State Transportation officials say they'll work with local leaders and Minnesota legislators to decide how best to use the money. Projects could range from redesigning approach lanes, redecking or resurfacing aging bridges to replacing them all together. Minnesota has more than 20,000 bridges of 10 feet or longer, with more than 600 listed in poor condition. Most bridges are part of the local highway system. Minnesota is set to receive a total of $302 million through 2026. Minnesota Transportation Commissioner Margaret Anderson Kelliher said final decisions on where the money will go have yet to be made. But she said there is no shortage of need. "We have Highway 61 over the Pigeon River up in northeastern Minnesota. It's a border bridge with Ontario and that project is coming up in 2023. We have four bridges on I-94 in Douglas County. This project is going to be open for bidding in 2023. And we believe that this funding could be helpful in that project as well," Kelliher said as she ticked through the possibilities. "The Dunwoody bridges in Minneapolis need to be redone soon." Much of the money will require a state match of 20 percent of the cost. That will be part of bills debated in the legislative session. Kelliher said the push for state money will involve the Legislature in decisions about how these and other infrastructure dollars get spent. "This is not a lone MnDOT question," she said. Locally maintained bridges could be exempt from the matching requirement, under new guidance from the Federal Highway Administration.
Final Planning
Bridges / Tunnels
$12,500,000.00
Public - State/Provincial
Demolition, New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 21, 2023
MN-61, Schroeder, MN
Related To This Project
Schroeder, MN
Bid Date: Mar 25 2021
Schroeder, MN
--
Schroeder, MN
--
Schroeder, MN
--
Schroeder, MN
Bid Date: Jan 29 2025
Schroeder, MN
Bid Date: Apr 16 2025
Schroeder, MN
--
Schroeder, MN
Bid Date: May 08 2024
Schroeder, MN
--
Schroeder, MN
Bid Date: Jun 03 2022
Schroeder, MN
Bid Date: Jan 27 2023
Nimrod, MN
Bid Date: Jul 18 2023
Schroeder, MN
Bid Date: May 08 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
