Site work and renovation of a civil project in Campbell, Missouri. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

The Project consists of: Contract 1 - Wastewater Treatment Plant Improvements - conversion of existing aerated lagoon into Sequencing Batch Reactor in Earthen Basins. Contract 2 - Wastewater Collection System Improvements - including open cut point repair, CIPP linings, Pipe Grouting, Manhole repairs, and service line repairs. Bids shall be on unit price and lump sum price basis. Attention of bidders is particularly called to the requirements as to conditions of employment to be observed and Davis Bacon and State Prevailing wage rates to be paid under the contract, Segregated Facility, Section 109, and E.O. 11246. MBE, WBE and Section 3-DBE bidders are encouraged to bid. Bidders should note the new requirements for OSHA training of workmen and the requirements prohibiting the employment of unauthorized aliens prohibited including the submission of an Affidavit of Work Authorization with their bids. Upon request and receipt of the non-refundable charge indicated above plus a non-refundable shipping charge, the Issuing Office will transmit the Bidding Documents via delivery service. The shipping charge amount will depend on the shipping method selected by the prospective Bidder. The date that the Bidding Documents are transmitted by the Issuing Office will be considered the Bidder's date of receipt of the Bidding Documents. Partial sets of Bidding Documents will not be available from the Issuing Office. Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including Addenda if any, obtained from sources other than the Issuing Office. No bidder may withdraw his bid within 90 days after the actual date of the opening thereof. No pre-bid conference will be held. Bid security shall be furnished in accordance with the Instructions to Bidders. The Work will be substantially completed within 365 calendar days ; General Conditions within 60 calendar days after the date for substantial completion for all Contracts.

Award

Water / Sewer

$3,533,835.00

Public - City

Renovation, Site Work

25

10

8

5

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Price and Payment Procedures, Allowances, Cash Allowances, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Plastic Fabrications
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Equipment, Domestic Water Filtration Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Air Outlets and Inlets
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Distribution, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Dewatering, Fill, Backfill, Compaction, Embankments
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Planting
Division 33 - Utilities

Division 33 - Utilities

Utilities, Operation and Maintenance of Utilities, Common Work Results for Utilities, Storm Drainage Utilities, Culverts, Pipe Culverts
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration, Instrumentation and Control for Process Systems, Process Control Auxiliary Devices
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Batching Equipment, Mixers, Piece Material Handling Equipment, Cranes and Hoists, Lifting Devices, Clamps
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Liquid Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
35
Active Projects
23
Bidding Soon
263
All Active Projects
122
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 10, 2022

April 11, 2022

img_map_placeholder

Multiple Locations, Campbell, MO


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.