Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 4, 2022 at 8:00 PM
Updated January 26, 2024
Site work and renovation of a civil project in Campbell, Missouri. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.
The Project consists of: Contract 1 - Wastewater Treatment Plant Improvements - conversion of existing aerated lagoon into Sequencing Batch Reactor in Earthen Basins. Contract 2 - Wastewater Collection System Improvements - including open cut point repair, CIPP linings, Pipe Grouting, Manhole repairs, and service line repairs. Bids shall be on unit price and lump sum price basis. Attention of bidders is particularly called to the requirements as to conditions of employment to be observed and Davis Bacon and State Prevailing wage rates to be paid under the contract, Segregated Facility, Section 109, and E.O. 11246. MBE, WBE and Section 3-DBE bidders are encouraged to bid. Bidders should note the new requirements for OSHA training of workmen and the requirements prohibiting the employment of unauthorized aliens prohibited including the submission of an Affidavit of Work Authorization with their bids. Upon request and receipt of the non-refundable charge indicated above plus a non-refundable shipping charge, the Issuing Office will transmit the Bidding Documents via delivery service. The shipping charge amount will depend on the shipping method selected by the prospective Bidder. The date that the Bidding Documents are transmitted by the Issuing Office will be considered the Bidder's date of receipt of the Bidding Documents. Partial sets of Bidding Documents will not be available from the Issuing Office. Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including Addenda if any, obtained from sources other than the Issuing Office. No bidder may withdraw his bid within 90 days after the actual date of the opening thereof. No pre-bid conference will be held. Bid security shall be furnished in accordance with the Instructions to Bidders. The Work will be substantially completed within 365 calendar days ; General Conditions within 60 calendar days after the date for substantial completion for all Contracts.
Award
Water / Sewer
$3,533,835.00
Public - City
Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Division 01 - General Requirements
Division 02 - Existing Conditions
Division 03 - Concrete
Division 04 - Masonry
Division 05 - Metals
Division 06 - Wood, Plastics, and Composites
Division 08 - Openings
Division 09 - Finishes
Division 22 - Plumbing
Division 23 - Heating Ventilating and Air Conditioning
Division 26 - Electrical
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 33 - Utilities
Division 34 - Transportation
Division 35 - Waterways and Marine Construction
Division 40 - Process Interconnections
Division 41 - Material Processing and Handling Equipment
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment
Division 44 - Pollution Control Equipment
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 10, 2022
April 11, 2022

Multiple Locations, Campbell, MO
Related To This Project
Campbell, MO
Bid Date: Apr 04 2024
Campbell, MO
--
Campbell, MO
Bid Date: Apr 28 2025
Campbell, MO
Bid Date: Aug 08 2025
Campbell, MO
Bid Date: Mar 28 2023
Campbell, MO
Bid Date: Jan 06 2023
Campbell, MO
--
Campbell, MO
Bid Date: Nov 17 2022
Anniston, MO
Bid Date: Apr 10 2019
Brentwood, MO
Bid Date: Aug 17 2018
Saint Louis, MO
Bid Date: Sep 20 2018
Saint Louis, MO
Bid Date: Oct 18 2018
Saint Louis, MO
Bid Date: Sep 05 2019
Kirkwood, MO
Bid Date: Aug 13 2019
Saint Louis, MO
Bid Date: Jun 25 2019
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Find. Bid. Win. Your Next Project Starts Here.
ConstructConnect gives you the tools to search, analyze, and bid on verified commercial projects before your competition. Explore detailed project data, bidding timelines, and contact info—right when you need it.
Sign up now to get free company and project data instantly. No payment required.
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.