Published February 8, 2022 at 7:00 PM

Updated October 1, 2024

Site work for a mixed-use development in New York, New York. Completed plans call for site work for a educational facility.

Performance Period: 365 Continuous Calendar Days (See Page CC-3 and Appendix B) Liquidated Damages: Two Thousand ($2,000) Dollars per Continuous Calendar Day and as set forth in the Construction Contract Page CC-3 and Appendix B SCA system-generated category:$1,000,001 to $4,000,000 (not to be interpreted as a "bid range") Upon request, the apparent low bidder for this project will be required to submit to the SCA its bid breakdown using a Project Specific Template, within seventy-two (72) hours of the bid opening or when requested. Bidders shall submit a LUMP SUM BID AMOUNT in the form attached as Appendix A to the Construction Contract to complete the project within the "Performance Period" after normal school hours under the conditions specified in the Contract Documents (as defined in the SCA's General Conditions dated July 1, 2021) inclusive of the Phasing Exhibit. A Bid Bond prepared on the form attached to the Construction Contract as Appendix C or a Certified Check of the Bidder for five (5%) percent of the Bid Amount must accompany the Lump Sum Bid Form. (Appendix A). A "Wicks" subcontractor is defined as a subcontractor performing construction work in the HVAC, Plumbing & Gas Fitting or Electrical Trades and (except for HVAC) licensed to do business in the CITY OF NEW YORK in that trade. The SCA has determined that the work under this solicitation involves Plumbing and Gas Fitting Work. All proposed "Wicks" trade subcontractors must be prequalified by the SCA. However, said firm must not be "disqualified", "suspended", or "ineligible", at the time of Bid Opening. Therefore, the Bidder must include with its bid, and in accordance with the Information for Bidders Section, the names of all its proposed "Wicks" trade subcontractor and an estimate for the trade listed in the previous sentence. The Bidder must complete and submit with its bid the "Wicks" Subcontractor Request Form. (Appendix G). If the Bidder intends to perform the "Wicks" trade work with its own forces, it must include with its bid, in accordance with the Information for Bidders Section, its name, the trade(s) and an estimate for the trade(s). Bidders intending to perform electrical or plumbing work with their own forces must be properly licensed to perform this work in the CITY OF NEW YORK. If a bidder intends to perform HVAC work with its own forces, it must furnish, upon the SCA's request, evidence satisfactory to the SCA that it possesses the technical capability to perform the HVAC work in accordance with the Contract Documents. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Educational

$2,375,000.00

Public - City

Site Work

27

17

2

5

Subscribe For Documents

106 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Field Samples, Mockups, Quality Control, Contractor Quality Control, Temporary Facilities and Controls, Temporary Utilities, Temporary Lighting, Construction Facilities, Sanitary Facilities, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching, Cleaning and Waste Management, Closeout Submittals, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation, Material Testing, Demolition, Selective Structure Demolition, Site Remediation, Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Cold-Formed Metal Framing, Metal Fabrications, Metal Railings, Decorative Metal
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Thermal Protection, Steep Slope Roofing, Shingles and Shakes, Roofing and Siding Panels, Siding
Division 08 - Openings

Division 08 - Openings

Windows, Hardware, Door Hardware
Division 09 - Finishes

Division 09 - Finishes

Finishes, Maintenance of Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Terrazzo Flooring, Carpeting, Wall Finishes, Stone Facing, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Partitions, Safety Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Lockers, Exterior Specialties, Protective Covers
Division 11 - Equipment

Division 11 - Equipment

Entertainment Equipment, Athletic Equipment, Recreational Equipment, Play Field Equipment and Structures, Playground Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings, Common Work Results for Furnishings, Fabrics, Art, Furnishings and Accessories, Rugs and Mats, Runners, Other Furnishings, Site Furnishings
Division 13 - Special Construction

Division 13 - Special Construction

Special Facility Components, Fountains
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Scaffolding
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping, Fire Pumps
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Pumps, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, HVAC Insulation, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Radiators
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Hangers and Supports for Electrical Systems, Low-Voltage Electrical Distribution, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Common Work Results for Exterior Improvements, Bases, Ballasts, and Paving, Unit Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Equipment, Water Service Connections, Water Utility Storage Tanks
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Clamps, Hooks, Mobile Plant Equipment, Mobile Earth Moving Equipment, Compactors
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
550
Active Projects
301
Bidding Soon
5,159
All Active Projects
2,391
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 7, 2022

April 8, 2022

img_map_placeholder

205-01 33rd Ave, New York, NY

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

PS159Q Playground

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.