BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, new construction, renovation and addition to a mixed-use development in Pella, Iowa. Working plans call for the addition of a educational facility; for the construction of a educational facility; and for the renovation of a educational facility.

Building expansion studies led to a proposed solution to construct one large addition that connects the two facilities. This solution is efficient for construction and costs, and it provides a literal bridge for access to shared resources without having to walk outside. One central music department of band, orchestra, and choir is proposed for both facilities to share. This solution frees up space at Jefferson for cafeteria expansion into spaces originally occupied by band and orchestra. The two buildings are proposed to still function as separate schools but will be physically linked providing flexibility for future needs of grades 4-8. Proposed Jefferson renovations include cafeteria expansion to accommodate 200 students per grade level, the addition of a second food service line, renovation and expansion of the Level 3 Special Ed classroom, replacement and expansion of student lockers, and the addition of a fire suppression system for a portion of the building that was not upgraded in the most recent renovation project. The bridge addition is proposed to include ten classrooms along a learning street to accommodate the capacity needed for Jefferson’s grades 4-6. It will also include band rehearsal space to accommodate the growing ensemble sizes of 150 students. Proposed Middle School renovations include expansion of choir rehearsal space to accommodate ensembles of 150 students, and orchestra rehearsal space to accommodate ensembles of 50 students. It also includes art classroom expansion to include both wet and dry labs, and family consumer science expansion to include both sewing/learning and food labs. The kitchen is proposed for expansion to provide permanent food service lines, and the cafeteria is proposed to be renovated and expanded to accommodate 200 students per grade level. Middle School and Jefferson parking will also be improved/expanded with this renovation project. As of January 19, 2022, a designer and construction manager have been selected. A firm timeline for construction has not been established. For more information on the 2021 Bond projects, please refer to https://facilityimprovements.pellaschools.org/

Pre-Construction/Negotiated

Educational

$19,000,000.00

Public - City

Addition, New Construction, Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
75
Active Projects
49
Bidding Soon
604
All Active Projects
257
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.