EN

BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 12, 2022 at 8:00 PM

Updated September 14, 2023

Renovation of an educational facility in Boston, Massachusetts. Working plans call for the renovation of a educational facility.

Utility Metering and SCADA. Providing a new metering and SCADA control system with associated software in all buildings and areas as indicated on the plans . The Contractor shall furnish and do everything, except as otherwise provided by specific notations herein or on the drawings, necessary to complete the work in accordance with the Plans and Project Manual. He shall furnish all plant, labor, materials, supplies, tools, water, machinery, implements, light, power, transportation, and other facilities required, and do all work necessary for the complete execution and completion of the Contract, except that work or materials specifically stated to be done or furnished by others. Alternate #1 - Provide metering for existing chillers utilizing existing CTs and PTs in chiller drive cabinet B. Alternate #2 - Connect and program twelve (12) downstream power meters in ISC to new monitoring system. Substantial Completion 240 Calendar days ; Final Acceptance within 60 Working days after the date specified for Substantial Completion

Final Planning

Educational

$3,986,000.00

Public - State/Provincial

Renovation

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Access to Site, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Construction Facilities, Sanitary Facilities, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Procedures, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Asbestos Remediation
Division 05 - Metals

Division 05 - Metals

Metal Fabrications, Metal Floor Plates
Division 08 - Openings

Division 08 - Openings

Windows, Aluminum Windows, Bronze Windows, Stainless-Steel Windows, Steel Windows, Hardware, Glazing, Glass Glazing
Division 26 - Electrical

Division 26 - Electrical

Electrical, Low-Voltage Electrical Distribution
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Excavation, Dewatering
Division 34 - Transportation

Division 34 - Transportation

Transportation Signaling and Control Equipment, Railway Signaling and Control Equipment, Supervisory Control and Data Acquisition
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Bulk Material Feeders, Feeders

Find More Local Projects

Within 75 Miles of This Project
278
Active Projects
133
Bidding Soon
2,687
All Active Projects
1,120
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 4, 2022

April 13, 2022

img_map_placeholder

Multiple Locations, Boston, MA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.