BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Chelsea, Massachusetts. Completed plans call for the renovation of a educational facility.

Should the successful bidder fail to commence or diligently perform according to the terms of the contract, the successful bidder agrees to pay to the City of Chelsea, as liquidated damages, Two Hundred Fifty Dollars ($250.00) per calendar day that the successful bidder fails to commence or diligently perform the work in accordance with the contract documents and/or is in violation of the contract. Liquidated damages assessed under this provision shall be deducted from any payment(s) due to the successful bidder. The entire existing roof assemblies shall be removed to expose decking. All repairs needed to be done before new roof installation. B. Install insulation assembly per these specifications. C. Install one ply of specified SA Vapor Retarder sheet directly to the existing wood deck. Install one ply of specified base sheets into modified cold adhesive per specifications. Install specified modified cap sheet into modified cold adhesive perspecifications. D. Seams on mineral cap sheet shall be heat welded with a 4" blade. Base flashing system shall be installed at all projections and perimeters using a 2- ply flashing system. The first ply shall be specified base sheet in trowel grade adhesive. The top flashing ply shall be the specified modified bitumen membrane with a polyester-fiberglass scrim set in trowel grade modified cold adhesive. F. Remove and replace existing roof drains. New Smith 10 10-R-C-CID drains, or equal, shall be installed. Drain diameter shall be determined by diameter of existing drain openings. All drain bowls shall be insulated and sumped with tapered insulation. Remove and replace drain litre down to one foot passed the elbow, approximately eight feet [8'] of pipe to be field verified. The contractor shall be responsible to provide all drain accessories. All drains cleared to 100ft outside of building. G. Miscellaneous flashing, caulking and accessories shall be installed. H. Prefabricated edge metal shall be installed at locations shown on drawings.

Bid Results

Educational

$3,609,000.00

Public - City

Renovation

15

16

2

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
302
Active Projects
167
Bidding Soon
2,649
All Active Projects
1,097
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.