BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in San Antonio, Texas. Completed plans call for site work for a water / sewer project.

The River Authority is seeking bids for CPS Bridge Riverbank Stabilization. The budget for the base bid for this project is $172,000. The awarded Contractor will stabilize a 150-foot section of riverbank with a rock sill and install a rock vane structure. Any questions in reference to this response should be directed to the Purchasing Department at 201 W. Sheridan, San Antonio Texas 78204 or by calling Purchasing at (210) 302-3603. Questions Due Date: Feb 1st 2022, 11:00 AM CST All bids shall be accompanied by a Cashier's or Certified Check in the amount of not less than five percent (5%) of the total bid, payable to the San Antonio River Authority, or an acceptable bid bond in the same amount. The successful bidder must furnish performance bond, payment and maintenance bond each in the amount of one hundred percent (100%) of the contract price from a surety company acceptable to the San Antonio River Authority. The River Authority reserves the right to refuse and reject any or all responses, waive any or all formalities or technicalities, accept the response or portions of the response determined to be the best value and most advantageous to the River Authority, and hold the responses for a period of 120 days without taking action. Respondents are required to hold their responses firm for the same period of time. Respondents are encouraged to prepare and submit their questions in writing in advance, in order to expedite the proceedings. The River Authority's responses to questions received in advance, may be distributed at the Pre-Submittal Conference and posted with this solicitation. Attendance at the Pre-Submittal Conference is optional, but highly recommended. This meeting place is accessible to disabled persons. The San Antonio River Authority Main Office Building is wheelchair accessible. The accessible entrance and parking are located at 201 W. Sheridan. Any oral responses provided by River Authority staff at the Pre-Submittal Conference Questions Due Date: Feb 1st 2022, 11:00 AM CST

Post-Bid

Water / Sewer

$172,000.00

Public - City

Site Work

Subscribe For Documents

43 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
61
Active Projects
39
Bidding Soon
1,972
All Active Projects
739
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 17, 2022

March 21, 2022

img_map_placeholder

331 Roosevelt Ave, San Antonio, TX

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.