EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 18, 2022 at 7:00 PM

Updated November 15, 2023

Renovation of a municipal facility in New Haven, Indiana. Completed plans call for the renovation of a municipal facility.

This project will consist of solar array procurement and installation at the City of New Haven Public Works Department building located at 2201 Summit Street, New Haven, IN 46774. The solar array will be installed on the roof of the existing building and will be used to power the building itself. The City of New Haven, Indiana, in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, A2 U.S.C 2000d to 2000d-4 and Title 49, Code of Federal Regulations, Department of Transportation, Subtitle A, Office the Secretary, Part lly ______ grams of the Department of Transportation and Title 23 Code of assisted 21, Nondiscrimination in Federally ' dpi . SDOI______________ _________ _________ Federal Regulations, Part 200, Title VI Program and Related Statutes, issued pursuant to such Acts, hereby notifies all bidders that it will affirmatively insure that in any contact entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of religion, race, color, national origin, sex, sexual orientation, gender identity, age, disability/ handicap and income in consideration for an award. Construction shall be in accordance with the applicable provisions included in the design documents including Scope of Work, Specifications, and Drawings. Bid proposals shall be completed and properly executed on the bid form and must be accompanied by an executed Indiana State Board of Accounts Form 96, confirmation that copies of Addenda were received (if issued), and satisfactory bid security. In determining the lowest responsible bidder, the City of New Haven Board of Public Works and Safety will consider the Total Base Bid made for the contract. The City of New Haven may also consider all other relevant facts mentioned in the Project Documents such as experience and subcontractors. The City of New Haven Board of Public Works and Safety reserve the right to reject any or all bids, to waive any informalities in bidding and to award contracts In the best interest of the City of New Haven. The City of New Haven Board of Public Works and Safety reserve the right to reduce project scope to meet any budget limitations if any were to arise. Any questions, prior to bid opening shall be directed to, in writing, via email to Dave Jones, Superintendent of Public Works, djones@newhaven.in.gov or by phone (260) 414-9097. Project includes installation per design the solar photovoltaic (PV) panels, racking, inverters, and electrical connective equipment on the grounds of the City of New Haven, Indiana. Install AC panel boxes for collecting the AC power from the inverters and distribute to the electrical service. Install connective equipment from the AC panels to the Indiana Michigan Power utility transformer. a. New Haven Public Works, 115.2 kWdc / 100.0 kWac: 1) Work includes all materials required to mount 240 solar panels on the public works roof, connect to 2 inverters, connect to AC collector panels, and interconnect to the main electrical feed at 277/480V (3-phase, Delta-grounded WYE) per the plans included in this packet. Work also includes all required grounding and Ethernet connections of the equipment. 2) All conductors may be run on the roof in cable tray. Any conductors in contact with or buried beneath the ground will need to be enclosed or encased in conduit that will prevent deterioration due to the caustic composition of the soil. Buried conductors must be installed by an OSHA HAZWOPER 40hr certified contractor. a) Schedule 80 PVC for direct buried conduit b) Schedule 40 for concrete encased conduit c) Galvanized rigid conduit with 1mil of asphaltic coating for direct bury 3) Install Solar Log solar site monitoring system. The inverters will be connected to the Base Station through the Ethernet or connected via RS-485 cable. System will include a) Solar Log Base Station b) Utility Grade Meter 4) All zoning and construction permitting will be completed by the Contractor with the City of New Haven.

Post-Bid

Municipal

$200,000.00

Public - City

Renovation

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Submittals, Bonds, Warranties
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Directories, Interior Specialties, Partitions
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Identification for Electrical Systems, Low-Voltage Electrical Distribution, Switchboards and Panelboards, Panelboards, Facility Electrical Power Generating and Storing Equipment, Power Filters and Conditioners, Capacitors, Lighting, Exterior Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 48 - Electrical Power Generation

Division 48 - Electrical Power Generation

Electrical Power Generation Equipment, Solar Energy Electrical Power Generation Equipment, Wind Energy Electrical Power Generation Equipment

Find More Local Projects

Within 75 Miles of This Project
78
Active Projects
52
Bidding Soon
636
All Active Projects
248
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 16, 2022

March 18, 2022

img_map_placeholder

2455 Summit St, New Haven, IN

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.