BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 16, 2022 at 7:00 PM

Updated November 15, 2023

Renovation of an educational facility in Conway, South Carolina. Completed plans call for the renovation of a 16,502-square-foot educational facility.

Partial roof replacement, approximately 16,502 SF BID SECURITY: Five Percent (5%) required per Bid Instructions PERFORMANCE & PAYMENT BONDS: One Hundred Percent (100%) of contracted amount as stated on the Notice of Intent to Award Contractor has access to the site beginning 6-7-2022 and shall continue through 8-15- 2022. Access to the site will be limited to after school hours and weekends from 8-15-2022 on, for any remaining overdue open punch list items. Substantial Completion: August 5, 2022 Final Completion of all work and punch list: August 15, 2022 First day of Students: August 16, 2022 (tentatively) DETAILED DESCRIPTION OF WORK TO BE PERFORMED: Re-roofing one wing of the existing school. Scope includes new insulation and all associated flashing. Alternate to add steel at existing roof access ladders for easier access. Project is ESSER II funded. See attached plans and ALL notes and specifications. Lead times are to be taken into consideration. The scope of the project includes re-roofing the indicated area, with an add / alternate to provide additional rails on the existing roof ladders, and a SF cost on replacement decking (in kind) inclusive of installation. The scope includes removal of all roofing, insulation and sheathing materials down to the existing metal roof decking. Any damaged or deteriorated sections of decking are to be brought to the attention of the AOR and HCS immediately. If it is deemed structurally unsound, those areas are to be replaced in kind. Contractor to anticipate any lead times in obtaining such material (s) so as not to delay the project or leave any portions open to the elements. Demolition is not permitted to begin until ALL materials are on site. Coordinate sequence and schedule of demolition as per the notes on plans. See; Scope / schedule / construction notes on plans for site and scheduling requirements. A lay-down area for materials, debris and port-a san will be located and coordinated with the school.

Post-Bid

Educational

$2,000,000.00

Public - County

Renovation

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
124
Active Projects
77
Bidding Soon
793
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 15, 2022

June 7, 2022

Project location map

251 Claridy Rd, Conway, SC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.