BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Nashua, New Hampshire. Completed plans call for the renovation of a educational facility.

The Plant Operations Department of the Nashua School District (NSD) is soliciting quotes for work relating to the refinishing of wooden gymnasium flooring. Scope of work includes all labor, materials and equipment required to wet screen and finish selected floors. This solicitation is for a three year contract. Quoted amounts should reflect the annual cost per school. Work shall include the following (where a product is listed, contractor shall provide "brand name or equal"): 1. Scrub floor utilizing a single brush floor machine equipped with a 120 grit disc under a white or steel wool pad; remove all scratches, heel marks, rubber burns, adhesive and gum. 2. Before cleaning solution has dried, pick up with a wet vacuum or auto-scrubber. Ensure all soiled cleaning solution has been removed from floor. 3. Damp mop floor twice using clean water. 4. Tack floor with solvent until floor is dust free. Allow floor to dry overnight. Tack floor again following morning. Allow floor to dry. 5. Apply two coats of "Bona Kemi SportPoly 350" oil based urethane gloss (brand name or equal) according to manufacturer's instructions. Steel wool between coats of finish and tack with solvent. No water-based finishes will be accepted. 6. Supplement gym or stage ventilation with floor fans as needed to assure adequate ventilation. 7. When finished the floor must present a smooth, even surface, free of streaks, bubbles, peeling or flaking. Edges should be straight, corners square with no build up. The last day of school is tentatively June 20th. All work shall be completed by Friday, August 19, 2022. Summer school starts in early July and ends the second week in August. The refinishing schedule must work around these summer schedules in addition to avoiding the high schools after the second week in August (fall sports practices). Upon awarding of this contract the Plant Operations Staff will work with the contractor to develop a schedule for refinishing the floors. Questions should be referred to Ms. Donna Grady (603-966-1507), Plant Operations Supervisors.

Post-Bid

Educational

$30,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
283
Active Projects
140
Bidding Soon
2,809
All Active Projects
1,181
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 23, 2022

March 23, 2022

img_map_placeholder

Multiple Locations, Nashua, NH

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.