Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 20, 2022 at 8:00 PM
Updated January 26, 2024
New construction of a mixed-use development in Fort Worth, Texas. Completed plans call for the construction of a clubhouse / community center; four-story above grade, 210-unit multi-residential development; and 24,000-square-foot retail development.
*As of May 20, 2022, this project is being slightly redesigned. Interested subcontractors may reach out to Block Companies directly for additional bid opportunities. IPRC Project No. IPRC21-0157 City Project No: 103819 The Stop Six Choice Neighborhood Initiative (CNI) is a multi-phase revitalization effort in the historic Stop Six neighborhood of southeast Fort Worth to transform the former J.A. Cavile Place public housing site (and adjacent / nearby parcels) into a new mixed-income community and act as a catalyst for additional new development in the area. Hughes House will be a 9% Low Income Housing Tax Credit (LIHTC) development on three city blocks composed of 1-, 2-, 3-, and 4-bedroom apartments. The new community will consist of eleven (13) buildings, including two (2) elevator-accessed mixed-use buildings with approximately 24,000 SF of ground floor commercial space along Rosedale and Amanda. The commercial area may be divided between community space, space for partners and social service providers, and retail space. Phase 2 - Housing Package Housing will consist of thirteen (13) buildings, including two (2) elevator-accessed mixed-use buildings with approximately 24,000 SF of ground floor commercial space along Rosedale and Amanda. The commercial area maybe divided between community space, space for partners and social service providers, and retail. Buildings 1 and 2 will be 4 level with podium foundations. Garden Apartments and Townhouses (11 buildings). Amenities including Property management office, furnished fitness space, a clubhouse, children's playscapes, a gazebo, a fully enclosed dog park, and a swimming pool. Phase 3 - Public (off site) Infrastructure Work consists of but is not limited to the following: Pipe Bursting Public Road work (new, mil and overlay, and patch and repair) Traffic Control Private Drive and sidewalk removal and replacement. Landscaping Sanitary Sewer Domestic/Fire water Storm Drainage Utility rework to existing single family residences.
Award
Multi-Residential
$65,000,000.00
Public - City
New Construction
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 21, 2022
June 1, 2022
Amanda Ave & E Rosedale St, Fort Worth, TX
Related To This Project
Fort Worth, TX
Bid Date: Mar 30 2021
Fort Worth, TX
Bid Date: Apr 07 2022
Fort Worth, TX
Bid Date: Apr 07 2022
Fort Worth, TX
Bid Date: Mar 31 2022
Fort Worth, TX
Bid Date: Apr 14 2022
Fort Worth, TX
--
Fort Worth, TX
--
Fort Worth, TX
Bid Date: May 17 2022
Fort Worth, TX
--
Fort Worth, TX
Bid Date: Mar 17 2022
Fort Worth, TX
Bid Date: May 19 2022
Fort Worth, TX
Bid Date: May 19 2022
Fort Worth, TX
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
