Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 14, 2022 at 7:00 PM
Updated November 15, 2023
Site work and paving for a civil project in Porter, Texas. Completed plans call for site work for a road / highway; for paving for a road / highway; water / sewer project; and water / sewer project.
The Site of the work is Southwest of the intersection of SH99 and FM 1314, in Montgomery County, Texas. Project No- 2018320-ML2 Reproduction charges will apply according to CivCastUSA rates. Substantial Completion of the Work within 75 calendar days ; Final Completion of the Work within 15 calendar days 8" PVC Water Main 8" Gate Valve & Box 8" - 11.25 Bend, Water Main Fitting 8" - 45 Bend, Water Main Fitting 2" Blow Off Valve & Box Tie to Existing 12" Waterline (Cut in 12"x8" Tee) Remove and Dispose of Ex. Flush Valve Assembly 8" PVC (SDR 26) Sanitary Sewer, All Depths 24" RCP CL. III Storm Sewer, All Depths 4" Thick Concrete Slope Paving (For Pipeline Crossing) Remove Ex. 24" S.E.T. and Connect Prop. 24" Storm Re-Grade Existing Ditch to Provide Positive Drainage (Approx. 53 LF) Brick Plug for 30" Storm
Bid Results
Roads / Highways
$990,033.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 10, 2022
March 14, 2022
Mirror Lake Cr, Porter, TX
Related To This Project
Porter, TX
Bid Date: Nov 02 2021
Porter, TX
--
Porter, TX
Bid Date: Dec 20 2018
Porter, TX
Bid Date: May 05 2022
Porter, TX
--
Porter, TX
--
Porter, TX
--
Porter, TX
Bid Date: Oct 19 2023
Porter, TX
Bid Date: Dec 31 2021
Porter, TX
Bid Date: Sep 19 2023
Porter, TX
--
Porter, TX
Bid Date: Mar 16 2020
Porter, TX
--
Porter, TX
--
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
