Site work and paving for a civil project in Milaca, Minnesota. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

2022 Street Improvements Project In general, Work consists of pavement replacement on streets within a residential neighborhood. Also included is installation of drain tile, storm sewer structure repairs, and spot sections of curb replacement. The Project includes the following approximate quantities: 120,400 SQ FT Full Depth Bituminous Reclamation (FDR) 1,200 LIN FT 4-inch Perforated PVC Drain Tile 1,500 LIN FT Concrete Curb and Gutter Spot Repairs 2650 TON Bituminous Along with miscellaneous storm sewer improvements, removals, restoration, and related appurtenances. Bid Security in the amount of 5 percent of the amount of the Bid must accompany each Bid in accordance with the Instructions to Bidders. The Owner reserves the right to retain the deposits of the 3 lowest Bidders for a period not to exceed 60 days after the date and time set for the Opening of Bids. No Bids may be withdrawn for a period of 60 days after the date and time set for the Opening of Bids. The Owner reserves the right to reject any and all Bids, to waive irregularities and informalities therein, and further reserves the right to award the Contract to the best interests of the Owner. The successful bidder must be a "responsible contractor." The term "responsible contractor" means a contractor as defined in Minnesota Statutes, section 16C.285, subdivision 3. Any prime contractor, subcontractor, or motor carrier that does not meet the minimum criteria or fails to comply with the verification requirements is not a responsible contractor and is not eligible to be awarded a construction contract for the project or to perform work on the project. A prime contractor, subcontractor, or motor carrier that makes a false statement under oath verifying compliance with the minimum criteria will be ineligible to be awarded a construction contract on the project, and the submission of a false statement may result in termination of a contract awarded to a prime contractor, subcontractor, or motor carrier that submits the false statement. A prime contractor shall include in its verification of compliance a list of all of its first-tier subcontractors that it intends to retain for work on the project. Before execution of a construction contract, a prime contractor shall submit a supplemental verification under oath confirming that all subcontractors and motor carriers that the prime contractor intends to use to perform project work have verified to the prime contractor, through a signed statement under oath by an owner or officer, that they meet the minimum criteria for a responsible contractor. Direct inquiries to Engineer's Project Manager, Phil Gravel (phil.gravel@stantec.com) or the city's Public Works Supervisor, Gary Kirkeby (gkirkeby@milacacity.com).

Post-Bid

Roads / Highways

$980,000.00

Public - City

Paving, Site Work

10

15

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Temporary Construction, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Submittals, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Site Demolition
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete, Concrete Curing
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Steep Slope Roofing, Shingles and Shakes, Asphalt Shingles
Division 09 - Finishes

Division 09 - Finishes

Tiling
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Finish Grading, Excavation and Fill, Subgrade Preparation, Excavation, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Base Courses, Aggregate Base Courses, Curbs and Gutters, Concrete Curbs and Gutters, Planting, Turf and Grasses, Seeding
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
125
Active Projects
75
Bidding Soon
828
All Active Projects
419
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 11, 2022

March 14, 2022

img_map_placeholder

Multiple Locations, Milaca, MN

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

2022 Street Improvements Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.