BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in New Bern, North Carolina. Completed plans call for the renovation of a municipal facility.

Furnishing of labor, material and equipment entering into the construction of the City Hall Elevator Annex project. The City of New Bern reserves the right to reject any and all bids. Within the Base Bid, the General Contractor constructs a conventional masonry load bearing structure erected upon a shallow foundation system and concrete slab on grade of approximately 3,552 square feet. The building consists of three stories with elevated floor slabs. Exterior walls are brick veneer with concrete masonry unit backup. Roofing is a machine seamed, standing seam metal system and a sloped, shingle system. Interior work consists of typical masonry partition walls, cold formed metal framing wall partitions with gypsum wallboard and interior finishes typical of commercial building types. A passenger elevator provides access to the upper floors. Plumbing distribution supports typical commercial toilet facilities. Mechanical distribution delivers conditioned air via heat pump equipment and is regulated by thermostat. Electrical service consists of a 350 amp EL Distribution Panel with 208/120 Volt, Three Phase, Four Wire distribution. Sitework includes building pad placement. Within the Base Bid, the General Contractor performs alterations of approximately 400 square feet. Interior work consists of typical masonry partition walls, wood stud wall partitions with plaster and interior finishes typical of historic commercial building types. Plumbing alterations remove typical toilets. Mechanical distribution remains in its current locations and capacity. Remove heat pump condensing units, reset in temporary locations before reinstalling condensing units in permanent locations. Electrical service remains in its current locations and capacity. Remove and replace the FACP in the basement. Sitework includes removal of monuments, flagpoles, landscaping and appurtenant distribution.

Bid Results

Municipal

$3,929,000.00

Public - City

Renovation

89

32

15

4

Subscribe For Documents

60 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
39
Active Projects
20
Bidding Soon
374
All Active Projects
149
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 24, 2022

March 28, 2022

img_map_placeholder

300 Pollock St, New Bern, NC


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.