BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 8, 2026 at 7:00 PM

Updated January 9, 2026

Site work and paving for a road / highway in Castle Rock, Colorado. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

Phase 2 includes: A roundabout at the Woodlands Boulevard intersection Widening the roadway to include additional lanes and on-street bike lanes between Woodlands Boulevard and Valley Drive Adding a second sidewalk connection between Gilbert Street and Valley Drive Storm drainage improvements between Gilbert Street and Woodlands Boulevard Installing a median between Rock Street and Valley Drive As of January 8, 2026, this project is the conceptual phase. An engineer is expected to be selected in February 2026. Design is targeted to be completed late 2026 with bidding in early 2027. Construction is anticipated to start in April 2027, with a 24 month duration. This project is included in the Town of Castle Rock Budget FY 2025 CIP. This project receives automated updates from sources only and will not be actively tracked by our Content team. Information is provided as-is for planning awareness. Should you wish to provide information on this project or are seeking an update, please email contentcase@constructconnect.com. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Roads / Highways

$15,000,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
58
Active Projects
0
Bidding Soon
853
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 1, 2027

Project location map

Fifth St, Castle Rock, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.