BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 7, 2022 at 7:00 PM

Updated January 26, 2024

Site work for a playground / park / athletic field in Soledad, California. Conceptual plans call for site work for a playground / park / athletic field.

This project shall include furnishing all labor, materials, tools, equipment, and incidentals required for construction in accordance with the project plans and these Specifications and are more fully described, but not limited to: Providing submittals, Prepare and implement BMPP, Clearing and grubbing, Installation of construction area signs, construction fencing and traffic control, Constructing park improvement plans, Cleanup of the work area, Project close-out Liquidated Damages $1,000 per day Project Duration 240 calendar days Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% The method of contractor selection has not been determined at this time

Conceptual

Playgrounds / Parks / Athletic Fields

$400,000.00

Public - City

Site Work

94

24

5

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
136
Active Projects
54
Bidding Soon
1,006
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.