Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 20, 2022 at 8:00 PM
Updated September 14, 2023
Renovation of a municipal facility in Merced, California. Completed plans call for the renovation of a municipal facility.
The County of Merced (County) is seeking a qualified Design-Build Entity (D-BE) to design and construct a replacement of the existing HVAC System at the existing Merced County Administration facility. This project will design and construct a replacement of the existing HVAC System at Merced County Administration facility located at 2222 M Street, Merced, California 95340, located in the City of Merced. It is a three-story structure with basement and houses various county government offices, with approximately 101,200 square feet of office space on County-owned land. The project includes replacement of the Administration Building HVAC system. The Administration HVAC replacement project will be constructed of durable materials and highly efficient HVAC equipment suitable for the appropriate size and square footage of the office building. In accordance with the provisions of the Public Contract Code, the County is utilizing a two-step process to prequalify and award a contract to a D-BE for the project. In this first step, the County is issuing the attached RFSQ with Prequalification Questionnaire. Based on criteria stated in the Prequalification Questionnaire, the County will score and rank all submittals. D-BEs with up to the three (3) highest scores will be eligible to participate in the second step in the process, the Request for Proposal (RFP). This RFSQ does not commit the County to issue an RFP or award a contract. The County reserves the right to cancel this RFSQ at any time, in part or in its entirety, should this be in the best interest of the County. Late submissions cannot be considered unless they are the only one received or there was mishandling on the part of the County staff. Submittals must be received at the County of Merced Department of Public Works, 345 W. 7th St., Building A, Merced, CA 95341-6041, front counter, by the identified Due Date and Time. The Board of Supervisors of Merced County reserves the right to reject any or all SOQs and to waive any informalities or irregularities. The total construction cost of the new facility is currently estimated to be $7,000,000.00
Post-Bid
Municipal
$7,000,000.00
Public - County
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 24, 2022
June 24, 2022
2222 M St, Merced, CA
Related To This Project
Merced, CA
--
Merced, CA
Bid Date: May 10 2022
Merced, CA
Bid Date: Oct 21 2021
Merced, CA
Bid Date: Aug 14 2025
Merced, CA
Bid Date: Jul 26 2022
Merced, CA
--
Merced, CA
Bid Date: Jun 07 2022
Merced, CA
Bid Date: May 26 2022
Merced, CA
Bid Date: Jun 07 2022
Merced, CA
Bid Date: May 31 2022
Merced, CA
Bid Date: Oct 18 2019
Merced, CA
Bid Date: May 24 2022
Merced, CA
Bid Date: Apr 13 2021
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
