Renovation of an educational facility in Raleigh, North Carolina. Completed plans call for the renovation of a educational facility.

This project will replace electric heating coils in the 7 air handlers serving buildings K and L at WTCC South Campus as well as new boilers and chiller to serve both buildings and all controls and electrical work associated with the new systems. In addition, building K shall receive full lighting upgrades and a new natural gas back-up generator. Wake Technical Community College encourages participation by MWBE firms and supports efforts to ensure and promote opportunities for minority businesses. General scope of work includes: The installation of new boilers with associated pumps and hot water piping distribution to serve Buildings SK and SL. As well as associated controls and electrical work. The project also includes the replacement of electric coils in the air handling unit at Building SK and the six air handling units at Building SL. The addition of a new office on the ground floor of Building SK. A new natural gas generator to serve as 100% back-up electrical power to building SK. As well as the replacement of a 119-gallon domestic water heater at Building SL. The project also includes alternates to replace the electric re-heat terminal units on the first floor of SK during the period of June 1, 2023, to July 15, 2023. The installation of a third boiler in Building SK. The replacement of electric water coolers, lavatory faucets, and mop sink faucets in Buildings SK and SL. And the replacement of the electric re-heat terminal units on the first floor of SK during the period of May 1, 2023, to July 15, 2023. Building SK, South Campus- a. Construction of a new boiler room with new gas fired boilers, associated pumps, piping, air removal, and controls in the ground floor of Building SK. With new ground level exhaust, make-up air, and replacement of existing electric unit heaters with new hot water unit heaters. b. Construction of a new facilities office with a new terminal unit, lighting, telephone, and data on the ground floor of Building SK. c. AHU-1 of Building SK, relocation of the duct smoke detector, installation of a new duct mounted inline pre-filter for the air monitoring flow station, the replacement of the electric pre-heat coil with a new hot water pre-heat coil. d. Installation of new energy sub-metering for the natural gas, heating hot water for Building SK and heating hot water for Building SL (meter to be located in Building SK). e. A new hot water control system will be installed. f. Installation of a new gas fired generator to serve Building SK. g. Electrical work shall consist of all necessary demolition and new connections to support mechanical equipment, control replacement, lighting, telephone, data, and smoke detector relocation. Building SL, South Campus- 1. Work includes the following: a. Install new underground hot water supply, hot water return, and 2" control conduit from new boiler room in Building SK to Building SL, with repair of all turf, concrete, and roadway to match existing surfaces. b. Replace soffit system on the East, North, and West sides of the ground floor. c. Install new heating hot water distribution system and replace exterior lighting in soffit system with the installation of 2" isolation valves for future connections. d. Work includes installation of a metal chase at each pipe riser to conceal piping and conduit serving first and second floors. e. Replace electric coils in AHU-1 through AHU-6 with hot water coils and reconnect new hot water control valve to existing control system. f. Replace existing crawl space exhaust fan EF-13 with two new thermostatically controlled exhaust fans and ducted to connect to existing exhaust louver. g. Replace existing 119-gallon domestic water heater with associated expansion tank and recirculating pump in Mechanical Room 010. h. Electrical work shall consist of all necessary demolition and new connections to support mechanical and plumbing equipment, lighting, necessary control support. i. Work shall include by Alternate the replacement of electric re-heat terminal units, exhaust fans, ductless mini-split system, unit heaters, controls, with associated ceiling, and electrical work for the 1st floor during the period of May 1, 2023, to July 15, 2023.

Award

Educational

$2,800,000.00

Public - County

Renovation

71

27

6

4

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Temporary Construction, Execution and Closeout Requirements, Execution, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Starting and Adjusting, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 05 - Metals

Division 05 - Metals

Metal Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Hardware, Door Hardware, Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Exterior Specialties, Protective Covers
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Plumbing Equipment, Domestic Water Filtration Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Air Duct Accessories, Dampers, HVAC Fans, Air Outlets and Inlets, Central Heating Equipment, Heating Boilers, Condensing Boilers, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Distribution, Low-Voltage Switchgear, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Lighting, Interior Lighting, Emergency Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Fill
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
106
Active Projects
66
Bidding Soon
1,334
All Active Projects
493
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 6, 2022

May 1, 2023

img_map_placeholder

Multiple Locations, Raleigh, NC


Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

Mechanical Equipment Replacements, Group 5: Building SK and SL Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.