Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and new construction of a transportation facility in Ochopee, Florida. Completed plans call for the construction of a transportation facility.
Solitication # 140P5422R0007 Issuing Date: 03/17/2022 Proposals must by submitted by 04/18/2022 at 1000 EDT to the address in Block 8 of the SF-1442 or via email to chad_williams@nps.gov CONSTRUCTION OF AVIATION SKID MOUNTED FUEL SYSTEM FOR BIG CYPRESS NATIONAL PRESERVE Site Visit: April 1, 2022 10am Eastern Address: 52105 Tamiami Trl East Ochopee, FL 34141 Legacy Doc #: NPS Delivery: 09/02/2022 Delivery Location Code: 0009060283 NPS, Big Cypress Natl Preserve 33100 Tamiami Trail E Ochopee FL 34141-9710 US Period of Performance: 05/02/2022 to 09/02/2022 00010 Fuel System Removal and Installation Product/Service Code: E1NA Product/Service Description: PURCHASE OF FUEL SUPPLY FACILITIES Requisition No: 0040562010 00020 Additive 1- BICY Fuel System Maintenance Product/Service Code: Z2NA Product/Service Description: REPAIR OR ALTERATION OF FUEL SUPPLY FACILITIES Requisition No: 0040563817 CONSTRUCTION OF AVIATION SKID MOUNTED FUEL SYSTEM FOR BIG CYPRESS NATIONAL PRESERVE PROJECT TITLE: Fuel System Replacement at Big Cypress National Preserve SITE LOCATION: Big Cypress National Preserve 52105 Tamiami Trail E Ochopee, FL 34141 NOTICE TO PROSPECTIVE OFFERORS SUBMISSION OF DOCUMENTS: Your offer must include the following Sections and Forms: 1. SF-1442 2. SOLICITATION 3. OFFER AND AWARD PLEASE NOTE: The SF-1442 must be signed, and dated, and Blocks 14 through 20c must be completed. SF-1442, ITEM 17, Offeror is cautioned to review acceptance time stated in Item 13d before completing this item. Proposals offering less than specified time will cause proposal to be rejected. SUBMIT AN OFFER TO THE FOLLOWING EMAIL: chad_williams@nps.gov THE MAGNITUDE OF THIS PROJECT IS BETWEEN $250,000 AND $500,000 BONDING - Successful offeror will be required to furnish Performance and Payment bonds on Standard Forms 25 and 25A based on total contract amounts in the following ranges: 100 percent performance bond, 100 percent payment bond. Offerors are now advised that the Government will inspect, accept, and take possession of completed work and release the bonding on completion/acceptance of the work per FAR 28.203-5. Site Superintendent for the project must be the prime contractor's employee. No Exceptions will be made. Site Visit will be held on April 1, 2022 at 10 am Eastern. Submit all questions regarding this solicitation in writing to the Contracting Officer. You must submit questions by April 4, 2022 by 10:00 A.M. EASTERN TIME. Questions submitted after this time may NOT be considered. Answers to the questions submitted in writing will be posted to the solicitation as an amendment on or around April 6, 2022. PROPOSALS ARE DUE ON APRIL 18, 2022 AT 10:00 A.M. EASTERN TIME. PAYMENT OF POSTAGE AND FEES All postage and fees related to submitting information forms, reports, etc., to the Contracting Officer (CO), Contract Specialist (CS), or the Contracting Officer's Representative (COR) shall be paid by the contractor. D.2 MARKING All information submitted to the CO, CS, or the COR shall clearly indicate the contract's Contract Number for which the information is being submitted. 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK APR 1984 The Contractor shall be required to (a) commence work under this contract within ten (10) calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 120 calendar days after receiving the notice to proceed. The time stated for completion shall include final cleanup of the premises. F.2 52.236-01 PERFORMANCE OF WORK BY THE CONTRACTOR APR 1984 The Contractor shall perform on the site, and with its own organization, work equivalent to at least fifteen percent (15%) of the total amount of work to be performed under the contract. This percentage may be reduced by a supplemental agreement to this contract if, during performing the work, the Contractor requests a reduction and the Contracting Officer determines that the reduction would be to the advantage of the Government. F.3 52.242-14 SUSPENSION OF WORK APR 1984 (a) The Contracting Officer may order the Contractor, in writing, to suspend, delay, or interrupt all or any part of the work of this contract for the period of time that the Contracting Officer determines appropriate for the convenience of the Government. (b) If the performance of all or any part of the work is, for an unreasonable period of time, suspended, delayed, or interrupted (1) by an act of the Contracting Officer in the administration of this contract, or (2) by the Contracting Officer's failure to act within the time specified in this contract (or within a reasonable time if not specified), an adjustment shall be made for any increase in the cost of performance of this contract (excluding profit) necessarily caused by the unreasonable suspension, delay, or interruption, and the contract modified in writing accordingly. However, no adjustment shall be made under this clause for any suspension, delay, or interruption to the extent that performance would have been so suspended, delayed, or interrupted by any other cause, including the fault or negligence of the Contractor, or for which an equitable adjustment is provided for or excluded under any other term or condition of this contract. (c) A claim under this clause shall not be allowed- (1) For any costs incurred more than 20 days before the Contractor shall have notified the Contracting Officer in writing of the act or failure to act involved (but this requirement shall not apply as to a claim resulting from a suspension order); 2) Unless the claim, in an amount stated, is asserted in writing as soon as practicable after the termination of the suspension, delay, or interruption, but not later than the date of final payment under the contract. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Post-Bid
Transportation Terminals
$500,000.00
Public - Federal
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 15, 2022
July 18, 2022
33100 Tamiami Trail E, Ochopee, FL
Related To This Project
Ochopee, FL
Bid Date: May 25 2022
Ochopee, FL
Bid Date: Jun 13 2023
Ochopee, FL
Bid Date: Jun 13 2023
Ochopee, FL
Bid Date: Jul 10 2023
Ochopee, FL
Bid Date: Aug 22 2023
Ochopee, FL
Bid Date: Aug 25 2023
Ochopee, FL
Bid Date: Aug 10 2023
Ochopee, FL
Bid Date: Jun 17 2022
Ochopee, FL
Bid Date: May 31 2022
Ochopee, FL
Bid Date: Apr 05 2022
Ochopee, FL
Bid Date: Feb 03 2023
Ochopee, FL
Bid Date: Jan 25 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.