BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a playground / park / athletic field in Buford, Georgia. Completed plans call for site work for a playground / park / athletic field.

This project consists of site work to complete the installation of the natural turf athletic fields and irrigation package at Seckinger High School. The project scope includes laser grading, soil preparation, irrigation design and installation, and natural turf athletic field installation. The scope includes design and installation of pumping system to provide irrigation from existing onsite wet pond. The system will have a back-up connection to the public water system from existing irrigation meter and supply line. The project includes the baseball field, softball field, and football/soccer practice field. The project does not include any fencing or dugouts. The project does include the installation of the skinned infields with pitcher's mound, bases and foul poles. The project scope includes necessary soil preparation. Outline scope is general in nature. Work shall be accomplished per project manual and drawings. Contract, if awarded, will be on a stipulated sum basis. Bids may not be withdrawn for a period of sixty (60) days after the date of receipt of bids. Bids shall be accompanied by a bid bond payable to Gwinnett County Board of Education in an amount equal to five percent of the base bid (Certified Checks NOT Acceptable). Performance Bond and Labor and Material Payment Bond, each amount equal to 100 percent of the contract sum, will be required of the successful bidder. These bonds shall be executed by a Surety Company licensed to do business in the State of Georgia, be listed on "Department of The Treasury Circular 570" and have an A.M. Best Company rating of at least Class "A". Bonds must be accompanied by letter stating company's current rating for verification prior to acceptance by the Owner and execution of the formal Owner/Contractor agreement. Any Bidder that is disqualified may respond to the Owner in writing within 20 days of the Notice of Disqualification as to why the Bidder feels the disqualification is unfounded. The written appeal from the disqualified Bidder will not change the decision already made on this project. However, a favorable appeal may open the way for the Bidder in question to bid on future Gwinnett County Public School System projects. _The Owner reserves the right to reject any and all bids, to waive any informalities in bidding, and to award a contract for any part of the work, or the job as a whole.

Award

Playgrounds / Parks / Athletic Fields

$748,789.00

Public - County

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
131
Active Projects
72
Bidding Soon
1,538
All Active Projects
573
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.