BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 28, 2022 at 7:00 PM

Updated November 15, 2023

Site work and paving for a mixed-use development in Mississauga, Ontario. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; road / highway; and water / sewer project.

The City of Mississauga is looking to hire a Contractor for City Repair for Roadway and Miscellaneous Work. The scope of work includes the maintenance repairs of roads, curbs, sidewalks, driveways, boulevards, City facilities, parking lots, parks, trails and/or pathways, railway crossings, and watercourses, or on an "as required basis", or miscellaneous works as directed by the City's Representative for the 2022 season. The scope of work under the City Repair (Roadway and Miscellaneous Works) Contract includes roadway and miscellaneous works involving the maintenance repairs of roads, curbs, sidewalks, driveways, boulevards, City facilities, parking lots, parks, trails and/or pathways, railway crossings, and watercourses that may vary in size, location and may require repairs and restoration on an "as required basis" as directed by the City's Representative that may be required throughout the City of Mississauga (referred to as the City) during the 2022 season. The Contractor agrees to assign sufficient crews to complete all Work Orders as further described below at SP 18 (Commitment of Work Force), and by the completion date stated in SP 25 (Reinstatement / Restoration Timelines). The Contractor shall carry out emergency and miscellaneous repairs at any time (24 hours a day, 7 days per week for the full duration of the Contract) upon notification from the Corporation. The Contractor shall be allowed twelve (12) hours to organize and mobilize the necessary resources required to respond to the emergency and miscellaneous call-out(s) upon notification from the City. The City anticipates repairs to commence after May 1, 2022 (or once materials are readily available). The City will prepare and issue all Work Orders to the Contractor. The assigned Work Orders may vary in scope, scale, and will require repairs at various locations throughout the City of Mississauga. The Contractor agrees to commence each Work Order issued by the City within twenty (20) working days from the date of issuance, or such other time period as directed by the City The City may establish sequential timing for Work Orders, and the Contractor shall allocate resources to meet the timing for Work Orders identified by the City. It is expected that all Work Orders assigned to a Contractor by the City will be completed by the Contractor within the specified Contract completion date. Documents can be obtained at: https://mississauga.bidsandtenders.ca Question Deadline: Wed Feb 2, 2022 4:00:00 PM (EST)

Award

Roads / Highways

$4,962,325.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

47 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
471
Active Projects
212
Bidding Soon
5,036
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 8, 2022

May 2, 2022

Project location map

Multiple Locations, Mississauga, ON

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.