BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Chaplin, Connecticut. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Bids must be sealed and marked North Bear Hill Road Intersection Realignment at Phoenixville Road (Route 198). A. Contractor shall follow unless otherwise stated and approved: o Designs provided by Northeastern Connecticut Council of Governments Engineer Syl Pauley, JR., P.E. as approved by the State of Connecticut Department of Transportation. o Design Standards - Connecticut Department of Transportation Highway Design Manual, 2003 Edition o 2020 Specifications - Connecticut Department of Transportation Form 818 B. Contractor Responsible for But Not Limited To: o Securing appropriate bonds o Project Management o Stakeout o DOT Encroachment Permit - DOT bond fees o DOT construction signage o Sawcut ends of pavement o Reclaim OR remove existing roadway asphalt o Strip topsoil - may stockpile on site o Provide and install structural fill o Provide and install bankrun gravel 12" thick required o Provide and install process gravel 8" thick required o Grade edges and work site to provide consistent and gradual slopes within work area as marked and defined by the Town of Chaplin o Fine grade and roll o Pave (2) courses of 2" thick Class A asphalt compacted o Provide and install 6" topsoil o Rake, seed, mulch disturbed areas o Install permanent signs o Epoxy Line stripping o Contractor shall allow continued use of North Bear Hill Rd to any vehicles. o If any part of roadway is constricted to one lane, contractor must provide clear, concise advanced warning and traffic control o Although discouraged, contractor may completely close the road for up to (4) four days throughout the duration of the project, either consecutive or separated. o Contractor SHALL provide the Town with 24 hours of notice before such closure(s) in order to provide the Town with adequate time to prepare. Town of Chaplin Responsible For: o Removal of all trees and stumps D. Contractors' requirements beyond engineered specifications: o Reclaim OR remove existing asphalt aprons to dry hydrant of fire pond and exit to transfer station o Remove poor or unwanted base material as needed o Install 8" process gravel o Grade area to provide sufficient drainage away from asphalt surfaces o Repave dry hydrant area, repave transfer station apron two (2) feet beyond gate o Pave (2) courses of 2" thick Class A asphalt compacted o Provide and install topsoil to disturbed areas o Rake, seed, and mulch

Award

Roads / Highways

$98,591.00

Public - City

Paving, Site Work

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
427
Active Projects
250
Bidding Soon
3,493
All Active Projects
1,538
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 24, 2022

April 1, 2022

img_map_placeholder

Multiple Locations, Chaplin, CT

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.