BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Corpus Christi, Texas. Working plans call for the renovation of a educational facility.

VALERE PUBLIC SCHOOLS, INC. REQUEST FOR PROPOSALS FOR CONSTRUCTION MANAGER-AT-RISK SERVICES RFP # 02 Promesa College Prep Improvements West Corpus Christi Pursuant to the provisions of Texas Government Code Chapter 2269, Subchapter F, as amended, it is the intention of the Valere Public Schools, Inc. (the District) to select via the one-step Request for Proposal process a Construction Manager-at-Risk for the construction of the project described herein. Persons or entities submitting proposals are referred to herein as Offeror(s). Proposals are to include the information requested in Section II of this Request for Proposals in the sequence and format prescribed. In addition to and separate from the requested information, Offerors submitting proposals may provide supplementary materials further describing their capabilities and experience. Offerors shall submit one (1) original and four (4) copies of the Proposal. Within thirty (30) days following the date of the opening, District staff will evaluate and rank each proposal submitted in relation to the selection criteria set forth herein. The District may also request additional information from Offerors at any time prior to final ranking of Offerors. The District may select all, some or none of the Offerors for interviews. Interviews with Offerors, if any, will not be scored separately from the proposal, but may result in an adjustment in score. A recommendation will be made to the Board of Trustees as to the ranking of the proposals The existing 39,220 SF facility will need minor renovations to include floor repair, plumbing repair, painting, door replacement and canopies. Site improvements include concrete bus drive, pavement striping and removal of asphalt for play-ground sodding. A new 23,000 SF addition will include gymnasium, 10 classrooms, restrooms, storage and concession area. Schedule: Renovation construction expected to take 7 months. New Addition expected to take 14 months.

Final Planning

Educational

$6,900,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
12
Active Projects
7
Bidding Soon
210
All Active Projects
90
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 8, 2022

June 8, 2022

img_map_placeholder

3102 Baldwin Blvd, Corpus Christi, TX


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.