BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 7, 2022 at 8:00 PM

Updated September 15, 2023

Demolition, site work, paving and new construction of a bridge / tunnel in Ventura, California. Design plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Per the owner, as of July 7, 2022, a design team has been selected. The owner states that the project is in the environmental clearance state and construction won't be for at least five years. Construction is anticipated from 2025 to 2027 and be;yond.* Closed solicitation has been included below for reference. .............. Main Street Bridge Over Ventura River - for Professional Environmental Engineering Services The method of Contractor Selection has not been Determined at this time

Design

Bridges / Tunnels

$39,425,000.00

Public - City

Demolition, New Construction, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
375
Active Projects
175
Bidding Soon
2,096
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 2, 2025

Project location map

E Main St, Ventura, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.