Site work, paving and outdoor lighting for a mixed-use development in Cedar Rapids, Iowa. Completed plans call for site work for a sidewalk / parking lot; for outdoor lighting for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

The Cedar Rapids Airport Commission is advertising for sealed bids for a proposed public improvement project to be known as Reconstruct Long Term Parking Lot E and Construct Long Term Parking Lot G & H2 Expansion - Phase 2 described as construction of additional parking, reconstruction of existing parking and associated work and located at the Eastern Iowa Airport, Cedar Rapids, Iowa The Work generally consists of construction of additional parking and reconstruction of existing parking and associated, pavement removals, excavation and grading, storm sewer, subdrain, subgrade treatment, Portland Cement Concrete pavement, curb and gutter, pavement markings, lighting, traffic control, seeding, fertilizing, and mulching at the Eastern Iowa Airport in Cedar Rapids, Iowa Questions and answers received from the pre-bid meeting on Tuesday, February 1st , and thru separate email or telephone correspondence are included with this Addendum. Bids shall be on a unit price basis. The Cedar Rapids Airport Commission has established a contract performance time, from the date indicated in the Notice-to-Proceed, following approval of properly executed contract documents, of: Early Start Date: April 4, 2022; Late Start Date: May 9, 2022; Substantially Complete within 150 Calendar Days; Phase 1 and Phase 2 shall be completed sequentially, not concurrently; Pavement Patching and Parking Lot Renaming completed concurrently with Phase 1 and Phase 2; Final Completion: 45 Calendar Days following Substantial Completion date. The Engineers opinion of probable construction cost for the Work is $2,850,000. The bidder should not include sales tax in the bid. Items included in the Project are exempt from State of Iowa and Local Option Sales and Use Taxes. Contractor is responsible for obtaining the exemption or for applying for reimbursement for such taxes paid. The successful bidder will be required to submit a Certification of Non-segregated Facilities and to notify prospective subcontractors of the requirement for such certification where the subcontract exceeds $10,000.00. Bid security in the amount of Five percent of the Bid must accompany each Bid in accordance with the General Conditions. The successful bidder shall be required to provide Performance and Payment Bonds, each in the amount of 100 percent of the Contract Price. Bid security and other bonds shall be provided on forms furnished by the Owner. The Cedar Rapids Airport Commission reserves the right to reject any and all bids, in whole or in part, with or without cause; to waive any informalities and technicalities; to enter such contracts as it deems in the best interest of the Cedar Rapids Airport Commission; and to re-advertise. The Cedar Rapids Airport Commission reserves the right to defer acceptance of any bid for 30 calendar days after the bids are received and opened.

Bid Results

Sidewalks / Parking Lot

$2,413,718.00

Public - State/Provincial

Outdoor Lighting, Paving, Site Work

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
69
Active Projects
33
Bidding Soon
483
All Active Projects
219
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 10, 2022

April 4, 2022

img_map_placeholder

2121 Arthur Collins Pkwy SW, Cedar Rapids, IA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.