Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a transportation facility in Millington, Tennessee. Completed plans call for the renovation of a transportation facility.
Question Deadline: Monday, April 4, 2022 by 5:00 p.m. local time. GA Fueling System Improvement Project - Construction All Bidders are responsible for checking the Authority's website up to the submission deadline for any updates, addenda or additional information. The successful Bidder must sign a contract with the Authority that includes Federal Aviation Administration provisions, if applicable, regarding the Buy American Preference, Foreign Trade Restriction, Davis-Bacon, Affirmative Action, Debarment and Suspension, and Drug-Free Workplace, all of which are incorporated herein by reference Each bid must be made by a contractor licensed in Tennessee and be accompanied by a 5% Bid Guarantee. The successful bidder must execute a Performance Bond and a Payment Bond in the amount of 100% each of the Contract Price. There is a 0% Disadvantaged Business Enterprise (DBE) participation goal for this project. The Authority is an equal opportunity employer and prohibits discrimination based on the grounds of age, race, sex, color, national origin, disability, marital status, military service, or sexual orientation in its hiring and employment practices and in the admission to, access to, or operation of its programs, services, and activities. The Authority reserves the right to reject any or all responses to this Request for Bids in whole or in part; to waive any informalities, technicalities, or omissions related to this Request for Bids; and to reject responses on any other basis authorized by the Authority's purchasing policies. *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com. o The purchase and install of (4) aboveground spill buckets in compliance with new 2021 TDEC UST regulations for hydrostatic testing. Two 3-foot by 3-foot concrete pads will be needed at the DeWitt Spain Airport to set the spill buckets properly. o The purchase and install of (4) overfill protection devices in each fueling system fill line. Additionally, the purchase and install of (4) flapper valves in their respective USTs will be needed to control the solenoid valve, providing an audible alarm at 90% capacity and close the valve at 95% capacity (to meet new 2021 TDEC regulations). Minimal electrical work will be required to power the solenoid valves. o Replace (1) leaking pressure-relief pop-off mechanism at Charles Baker Airport. Contractor must have UST fueling system experience; TDEC experience preferred.
Post-Bid
Transportation Terminals
$600,000.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 14, 2022
May 16, 2022
Multiple Locations, Millington, TN
Related To This Project
Millington, TN
Bid Date: May 04 2022
Millington, TN
Bid Date: Jun 09 2022
Non-Appropriated Fund Instrumentality (NAFI) Limited Service - Architect-Engineering (A-E) - 4699418
Millington, TN
Bid Date: Jun 14 2022
Millington, TN
Bid Date: Jun 28 2022
Millington, TN
Bid Date: Jul 12 2022
Millington, TN
Bid Date: Jul 27 2022
Millington, TN
Bid Date: Aug 02 2022
Millington, TN
Bid Date: Aug 02 2022
Millington, TN
Bid Date: Apr 28 2022
Millington, TN
Bid Date: Mar 25 2022
Millington, TN
--
Millington, TN
Bid Date: Jun 12 2024
Millington, TN
Bid Date: Nov 14 2022
Millington, TN
Bid Date: Nov 14 2022
Millington, TN
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Stop wasting time. Get and stay ahead of your competition.
Get instant access to the most complete and actionable commercial construction data available. Try it for free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.