BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 27, 2022 at 8:00 PM

Updated September 14, 2023

Demolition, site work, new construction and renovation of an educational facility in East Walpole, Massachusetts. Completed plans call for the demolition of a educational facility; for the construction of a 162,000-square-foot, three-story above grade educational facility; for the renovation of a educational facility; and for site work for a educational facility.

Replacement of Bird Middle School on the existing school's campus. The project will be a new 162,000 GSF, 3 story structure housing a combined school enrollment of 905 students in grades 6-8. Estimated construction duration 30 months for all phases of work including new; site enabling, construction, building demo and sitework. Logistics are important for this project as the new school will be located behind the existing school which, along with the existing playing fields, will remain operational during construction. Early packages are anticipated for the enabling phase at a minimum. Targeting Net-Zero ready construction with provisions for future photovoltaic systems and LEED Silver certification. Town of Walpole School Building Committee invites Qualifications for Construction Manager at Risk firms pursuant to M.G.L. c. 149A. Response to this Request of Qualifications is the first step in a two-phase procurement process. Contractor Qualification DCAMM Certificate Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. The project Minority Business Enterprise (MBE) participation goal is 8.8%. The project Women Business Enterprise (WBE) participation goal is 4.2%. payment and performance bonds on the Project in an amount equal to or greater than 110 percent of the estimated construction cost of the Project Estimated Construction Duration: Thirty (30) months for all phases of the work including site enabling, new construction, building demolition and sitework. This project is to build a new school at the current Bird Middle School site to house the entire middle school population in the town of Walpole. The new combined middle school will serve 905 students in grades from 6-8. The proposed new middle school building is a three-story building of 162,193 gsf. The new building will be located to the north and east of the existing Bird Middle School. The new building will have the main entrances on the ground floor and three story classroom wings. Administration, auditorium, cafeteria, and kitchen with gym and media center on the second floor. The new school is targeting Net-Zero ready construction including VRF mechanical systems. The project is pursuing LEED Silver as part of the project.

Post-Bid

Educational

$92,600,000.00

Public - City

Demolition, LEED Certification, New Construction, Renovation, Site Work

Subscribe For Documents

51 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
605
Active Projects
266
Bidding Soon
4,319
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 10, 2022

July 11, 2022

Project location map

625 Washington St, East Walpole, MA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.