Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 22, 2022 at 7:00 PM
Updated November 15, 2023
Site work for a water / sewer project in Vinton, Texas. Completed plans call for site work for a water / sewer project.
The Project includes the following Work: Installing 121 back flow preventors, 121 pressure regulators, 121 water meters (provided by the contractor, but installed by El Paso Water) and any copper piping necessary involved to connect the new water meter to the existing water line on private property by a master plumber. Water meter is to be coordinated and installed by El Paso Water. Work also includes restoring any property to original condition. Bids are requested for the following Contract: Phase I Vinton Water Meter Connection. Last day for questions is February 11, 2022 at COB. All questions should be sent to Klabree@parkhill.com Instructions to Bidders. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. American Iron and Steel Section 746 of Title VII of the Consolidated Appropriations Act of 2017 (Division A - Agriculture, Rural Development, Food and Drug Administration, and Related Agencies Appropriations Act, 2017) and subsequent statutes mandating domestic preference applies an American Iron and Steel requirement to this project. All iron and steel products used in this project must be produced in the United States. The term iron and steel products means the following products made primarily of iron or steel: lined or unlined pipes and fittings, manhole covers and other municipal castings, hydrants, tanks, flanges, pipe clamps and restraints, valves, structural steel, reinforced precast concrete, and Construction Materials. Substantial Completion: Contractorshall pay Owner $ 1200 for each day that expires after the time (as duly adjusted pursuant to the Contract) specified above for Substantial Completion, until the Work is substantially complete. 2. Completion of Remaining Work: After Substantial Completion, if Contractor shall neglect, refuse, orfail to complete the remaining Work within the Contract Times(as duly adjusted pursuant to the Contract) for completion and readinessforfinal payment, Contractorshall pay Owner $ 400 for each day that expires after such time until the Work is completed and ready for final payment.
Post-Bid
Water / Sewer
$346,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 24, 2022
March 24, 2022
Multiple Locations, Vinton, TX
Related To This Project
Vinton, TX
Bid Date: Jun 24 2025
Vinton, TX
Bid Date: Feb 28 2025
Vinton, TX
--
Vinton, TX
--
Vinton, TX
Bid Date: Apr 06 2023
Vinton, TX
--
Arlington, TX
Bid Date: Feb 24 2022
Lubbock, TX
Bid Date: Feb 24 2022
Austin, TX
Bid Date: Feb 24 2022
Garland, TX
Bid Date: Feb 24 2022
Grand Prairie, TX
--
Greenville, TX
Bid Date: Feb 24 2022
The Best Gift for Your Business? Seeing the Future of Construction.
We’re unwrapping exclusive project leads early this year. Gain instant access to commercial data that keeps you steps ahead of the competition. Sign up today to see the projects others won't discover until they're already spoken for.
