Published February 22, 2022 at 7:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Vinton, Texas. Completed plans call for site work for a water / sewer project.

The Project includes the following Work: Installing 121 back flow preventors, 121 pressure regulators, 121 water meters (provided by the contractor, but installed by El Paso Water) and any copper piping necessary involved to connect the new water meter to the existing water line on private property by a master plumber. Water meter is to be coordinated and installed by El Paso Water. Work also includes restoring any property to original condition. Bids are requested for the following Contract: Phase I Vinton Water Meter Connection. Last day for questions is February 11, 2022 at COB. All questions should be sent to Klabree@parkhill.com Instructions to Bidders. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. American Iron and Steel Section 746 of Title VII of the Consolidated Appropriations Act of 2017 (Division A - Agriculture, Rural Development, Food and Drug Administration, and Related Agencies Appropriations Act, 2017) and subsequent statutes mandating domestic preference applies an American Iron and Steel requirement to this project. All iron and steel products used in this project must be produced in the United States. The term iron and steel products means the following products made primarily of iron or steel: lined or unlined pipes and fittings, manhole covers and other municipal castings, hydrants, tanks, flanges, pipe clamps and restraints, valves, structural steel, reinforced precast concrete, and Construction Materials. Substantial Completion: Contractorshall pay Owner $ 1200 for each day that expires after the time (as duly adjusted pursuant to the Contract) specified above for Substantial Completion, until the Work is substantially complete. 2. Completion of Remaining Work: After Substantial Completion, if Contractor shall neglect, refuse, orfail to complete the remaining Work within the Contract Times(as duly adjusted pursuant to the Contract) for completion and readinessforfinal payment, Contractorshall pay Owner $ 400 for each day that expires after such time until the Work is completed and ready for final payment.

Post-Bid

Water / Sewer

$346,000.00

Public - City

Site Work

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
12
Active Projects
6
Bidding Soon
203
All Active Projects
107
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 24, 2022

March 24, 2022

img_map_placeholder

Multiple Locations, Vinton, TX


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.