Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 2, 2022 at 7:00 PM
Updated November 15, 2023
Site work for a civil project in Bellevue, Michigan. Completed plans call for site work for a road / highway; and water / sewer project.
This project received no bids and it is unknown at this time if it will go back out for rebid. This project consists of the boring and jacking of a steel casing beneath the CN Railroad tracks at Williams Street, the insertion of a new ductile iron water main, the use of nonstructural flowable fill in the annular void and the connection of the new water main to the existing water mains on either side of the railroad tracks in the Village of Bellevue. All work is within the Village of Bellevue, Williams Street right-of-way. Contractor shall be responsible for obtaining the construction permit from CN railroad and adhering to all permit requirements including but not limited to monitoring of existing conditions and providing an on-site professional engineer licensed in the State of Michigan during boring and jacking operations. Construction shall include: boring and jacking of 120 linear feet of 36" diameter steel casing; installation of 12-inch ductile iron water main in steel casing; filling of annual void between casing and water main using non-structural flowable fill; connection to existing water main in Williams Street; grouting of existing 6-inch water main beneath railroad; removal and replacement of HMA road surface; clean-up and restoration; monitoring activities as required by CN Railroad; and, all other items necessary and required for a complete and fully operational water main. Electronic Bidding Documents will be furnished free-of-charge by registering with Wolverine Engineers & Surveyors, Inc. All bidders MUST register with Engineer by sending an email to janicer@wolveng.com requesting to be added to the bidders list. This project consists of the boring and jacking of a steel casing beneath the CN Railroad tracks at Williams Street, the insertion of a new ductile iron water main, the use of nonstructural flowable fill in the annular void and the connection of the new water main to the existing water mains on either side of the railroad tracks in the Village of Bellevue. All work is within the Village of Bellevue, Williams Street right-of-way. Contractor shall be responsible for obtaining the construction permit from CN railroad and adhering to all permit requirements including but not limited to monitoring of existing conditions and providing an on-site professional engineer licensed in the State of Michigan during boring and jacking operations. Construction shall include: boring and jacking of 120 linear feet of 36 diameter steel casing; installation of 12-inch ductile iron water main in steel casing; filling of annual void between casing and water main using non-structural flowable fill; connection to existing water main in Williams Street; grouting of existing 6-inch water main beneath railroad; removal and replacement of HMA road surface; clean-up and restoration; monitoring activities as required by CN Railroad; and, all other items necessary and required for a complete and fully operational water main. The work consists of doing everything required to be performed and providing and furnishing all of the labor, power, materials as described in the Specifications and Drawings, necessary tools and equipment, Workman's Compensation and Property Damage and Public Liability Insurance, superintendence and all utility and transportation services required to complete in a workmanlike manner all the work required.
Post-Bid
Water / Sewer
$218,200.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 23, 2022
April 22, 2022
N Williams St, Bellevue, MI
Related To This Project
Bellevue, MI
--
Wastewater System Improvements Project Contract A: Wastewater Treatment Plant Improvements - 5534967
Bellevue, MI
Bid Date: Oct 22 2024
Bellevue, MI
Bid Date: Oct 17 2024
Bellevue, MI
Bid Date: Oct 17 2024
Bellevue, MI
Bid Date: Mar 12 2025
Bellevue, MI
Bid Date: Jun 24 2025
Bellevue, MI
Bid Date: Sep 19 2025
Bellevue, MI
Bid Date: Mar 17 2022
Bellevue, MI
Bid Date: Aug 11 2023
Bellevue, MI
Bid Date: Jan 26 2023
Bellevue, MI
Bid Date: Sep 15 2022
Bellevue, MI
Bid Date: Aug 05 2022
Bellevue, MI
Bid Date: Aug 10 2022
Bellevue, MI
Bid Date: Feb 03 2023
Bellevue, MI
Bid Date: Oct 05 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
