Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published February 14, 2022 at 7:00 PM
Updated January 29, 2024
Site work for a civil project in Port Coquitlam, British Columbia. Completed plans call for site work for a bridge / tunnel; road / highway; and water / sewer project.
The Work, which is described in the Tender Documents and is to be performed in accordance with all the requirements contained in the Tender Document, is generally described as follows: Approximately 100m of road raising Approximately 20m of 2100mm HDPE culvert installation Approximately 18m of 750mm HDPE culvert installation Approximately 360m2 of SierraScape retaining wall Approximately 120m of concrete barriers and handrails Private property works including driveways, gate restoration, and retaining walls Approximately 210m of 150mm DI Watermain installation and services, hydrants, and fittings PRV Station replacement including mechanical and electrical components Environmental protection Pavement markings Topsoil and Seeding Documents can be obtained from www.bcbid.gov.bc.ca.
Post-Bid
Water / Sewer
$1,000,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Division 01 - General Requirements
Division 03 - Concrete
Division 08 - Openings
Division 09 - Finishes
Division 10 - Specialties
Division 11 - Equipment
Division 12 - Furnishings
Division 14 - Conveying Equipment
Division 22 - Plumbing
Division 23 - Heating Ventilating and Air Conditioning
Division 26 - Electrical
Division 28 - Electronic Safety and Security
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 33 - Utilities
Division 34 - Transportation
Division 35 - Waterways and Marine Construction
Division 40 - Process Interconnections
Division 41 - Material Processing and Handling Equipment
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment
Division 44 - Pollution Control Equipment
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 15, 2022
March 21, 2022
Multiple Locations, Port Coquitlam, BC
Related To This Project
Port Coquitlam, BC
Bid Date: Mar 17 2022
Port Coquitlam, BC
--
Port Coquitlam, BC
--
Port Coquitlam, BC
--
Port Coquitlam, BC
--
Port Coquitlam, BC
--
Port Coquitlam, BC
--
Port Coquitlam, BC
--
Port Coquitlam, BC
--
Port Coquitlam, BC
--
Port Coquitlam, BC
--
Port Coquitlam, BC
Bid Date: Apr 20 2021
Port Coquitlam, BC
--
Port Coquitlam, BC
Bid Date: Feb 03 2022
Port Coquitlam, BC
Bid Date: Oct 14 2021
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Find. Bid. Win. Your Next Project Starts Here.
ConstructConnect gives you the tools to search, analyze, and bid on verified commercial projects before your competition. Explore detailed project data, bidding timelines, and contact info—right when you need it.
Sign up now to get free company and project data instantly. No payment required.
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.