Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a road / highway in Greeley, Colorado. Completed plans call for site work for a road / highway; and for paving for a road / highway.
The project is broken into 2 major components, Phase 1 from 61st to 66th Ave and Phase 2 from 59th to 61st Ave. Figure 1 below outlines these areas accordingly. Performance Bond 100 % Payment Bond 100 % Insurance Required Question Acceptance Deadline 02/16/2022 07:00 PM EST Questions are submitted online No Phase 1 of the project includes the portion of C St between 61st and 66 th Ave. As part of the development agreement for the residential construction immediately south of the project between 61st and 66 th Ave, a 4 lane roadway (2 lanes in either direction) was designed and was to be constructed. The developer fully planned this segment and constructed 2 lanes of the 4 lane construction as well as curb, gutter, and sidewalk on the south side of the street for approximately the western half of Phase 1. All design available plans, reports, and available information from the previous design are available on the City's FTP site. All City supplied documents are for reference purposes only. The constructed portion of Phase 1 is outlined above. During construction it was discovered that the City did not own the Right of Way for the full construction area so construction was halted. No improvement work, other than mass grading to tie into the development to the south has been performed in the Not Constructed portion of Phase 1. Ultimately the City desires a 2 lane collector configuration for the entire portion of C St between 59 th and 66 th Ave. The design plans shall include the intersection of 61 st Ave and C St, which has significant grade differentials between the constructed 61 st Ave and proposed connection to C St. The 61 st Ave and C St intersection may be a roundabout style intersection depending on the recommendations from the traffic report. The connection of F St to the north shall be a curb cut / driveway entrance only. Phase 2 of the project includes finishing the connection of C St from 59 th to 66 th by improving the segment between 59 th Ave and 61 st Ave. While the design of this segment is included in this Request for Proposal, this construction is currently unfunded and would executed be at a later date. The City would like for a Roundabout to be constructed at the intersection of C St and 59 th Ave. A major consideration for the Phase 2 portion of the design engineering is the crossing of the Sheep Draw. Included in the Phase 2 design shall be a 12" PVC water line connecting the City's water system from 59th to 61st Ave along C St. This design would include the necessity of a stub out to the east for the 61st Ave intersection during Phase 1 of the project. The completion date of providing the required product and services shall be October 1, 2022
Post-Bid
Roads / Highways
$400,000.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 25, 2022
March 28, 2022
C St, Greeley, CO
Related To This Project
Greeley, CO
--
Greeley, CO
Bid Date: Oct 22 2021
Greeley, CO
Bid Date: Mar 09 2022
Greeley, CO
--
Greeley, CO
--
Greeley, CO
Bid Date: Mar 10 2022
Greeley, CO
Bid Date: Feb 24 2022
Greeley, CO
Bid Date: Jan 28 2022
Greeley, CO
--
Greeley, CO
Bid Date: Feb 08 2022
Greeley, CO
Bid Date: Feb 10 2022
Greeley, CO
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.