BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Calumet City, Illinois. Completed plans call for the renovation of a educational facility.

Board of Education of School District 155 that sealed bids will be received for Outdoor Pavilions, Lockers, and Gym Floor Replacement at Woodrow Wilson School, Wentworth Intermediate School, and Wentworth Jr. High School in the following bid categories: Bid Package #1 - Excavation; Bid Package #2 - Concrete; Bid Package #3 - Carpentry and General Construction, Bid Package #4 - Electrical, Bid Package #5- Flooring, and Bid Package #6 - Lockers. This project titled "SD155 OUTDOOR PAVILIONS, LOCKERS, AND GYM FLOOR REPLACEMENT" consists of the following major elements: 1.Site work and general construction for new classroom pavilions on 3 sites; 2.New Playground equipment and surface at 1 site; 3.Removal of existing lockers and replacement with new corridor lockers; 4.Removal of existing gym floor and replacement with new sports flooring system; 5.All other work indicated on the drawings and in the project manual for this project. B. All work on this project will be awarded to multiple prime contractors. C. Any required asbestos abatement work in existing school building will be performed by a separate abatement contractor under the direction of the Owner's consultant. Owner and Architect reserve the right to exclude contractors from bidding this project, if upon review of the Contractor's Qualification Statement submitted, the particular contractor is not found qualified to successfully execute this type of project. Exclusion may be based upon contractor's past experience, performance or financial stability. The successful Contractors will be required to furnish to the Owner a Performance Bond and Payment Bond for 100% of the total contract portion pertaining to their work. The "Prime" Bidder shall submit a Bid Bond or Certified Check payable to the Owner for 5% of the amount of the base bid with his bid, which sum shall be forfeited to the Owner as liquidated damages if the prime contractor awarded the contract refuses to sign the Contract Agreement, as presented in the construction manual, and file an approved Surety Company's Bond for the full amount of the contract, in accordance with the terms of the project manual, with fifteen (15) days after being awarded the contract.

Bid Results

Educational

$1,274,695.00

Public - County

Renovation

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
176
Active Projects
80
Bidding Soon
1,785
All Active Projects
730
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 8, 2022

June 1, 2022

img_map_placeholder

Multiple Locations, Calumet City, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.