BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 29, 2022 at 7:00 PM

Updated November 15, 2023

Demolition and site work for a residential development in Lodi, New York. Completed plans call for the demolition of a residential development; and for site work for a residential development.

These structures are slated for demolition and have been determined to be structurally unsound in accordance with 12 NYCRR Part 56-5.1(b). As such, the requirements of 12 NYCRR Part 56-11.5 shall apply and the project shall be bid accordingly. In response to this bid solicitation, please bid a price that covers the demolition of the addresses listed herein, for all labor, materials, equipment, supplies, and incidentals necessary and required to complete the work of outlined below. Demolition projects must be undertaken consecutively or concurrently with one another. Demolition projects must be completed before the end of March 31st, 2022. The Contractor will provide the Land Bank with at least forty-eight (48) hours' notice prior to the commencing the work at each property. The contractor shall obtain, at its sole cost and expense, all permits, authorizations, approvals, and licenses necessary for the planning, performance, and completion of the Work in accordance with the requirements of the respective municipal agencies and other authorities having jurisdiction. The Contractor shall comply with all federal, state, county, city, town and other applicable laws, ordinances, rules, and regulations and all orders and rules of any duly constituted authorities affecting the Property or bearing on the performance of the work. This includes, but is not limited to 12 NYCRR Part 56-11.5 and all applicable Stormwater regulations. The Contractor will contact Dig Safely NY at least forty-eight (48) hours prior to beginning any excavation at the Property. The Contractor will confirm that all utilities are disconnected before commencing any Work. Disconnections were ordered through NYSEG on 1/14/2021 and each property was issued job numbers. The Contractor will demolish all buildings, structures, and driveways on, in, or upon the Property. The Contractor will provide the Land Bank with all bills of lading and dump tickets, for all hazardous and non-hazardous waste. The Contractor will completely remove all the construction materials and any contents of the demolished structures from the Property. The Contractor will arrange for transportation of the construction materials and any contents of the demolished structures to lawful disposal, storage, or recycling locations, as necessary. The Contractor will fill the foundation pit and appropriate materials. The foundation pit shall not be filled with debris. Any proposed fill must be approved in advance by the Land Bank's Engineer. Fill cannot include organic materials that will decompose and settle. Fill cannot include construction debris other than concrete or stone. Foundation walls must be removed to three feet below grade. The Contractor must ensure that basement floors are broken up to allow for drainage. The Contractor must contact the Land Bank's Engineer for inspection before filling the foundation pit. The remaining foundation pit shall be filled with material not larger than 12 cubic inches up to two feet below grade. Clean fill dirt shall be placed above and any rocks contained can be no longer than four cubic inches. The Contractor will finish grading the land on the Property so that there is no standing water on the property or adverse drainage impacts to adjacent property. The Contractor will add sufficient topsoil and will ensure that the property is free from rocks and other items that would prevent grass growth. The Contractor must ensure that there is a minimum of 4" of clean, screened topsoil free of any stones large enough to impede grass growth, or that might damage or be thrown by a lawnmower covering the whole site. The Contractor must contact the Land Bank for inspection before proceeding with hydroseeding. The Contractor will apply hydroseeding in a mix appropriate for local condition that would grow grass and prevent erosion. Hydroseeding shall be applied at a minimum rate of 5 pounds per 100 square feet. The driveway must be removed of all blacktop and gravel to support grass growth. Grading/seeding must be completed within 30 days of pulling the demolition permit unless impossible due to inclement weather. The Contractor will exercise caution so as to not damage any pedestrian sidewalk if present. If a sidewalk is damaged, the Contractor must repair or replace the damaged portion in a timely manner and prior to the Completion Date. The Contractor will provide before and after time/date stamped photos of sidewalk and property. The Contractor must contact the Land Bank's Engineer for a Final Inspection. *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com.

Post-Bid

Residential Subdivision

$40,000.00

Public - State/Provincial

Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
237
Active Projects
52
Bidding Soon
1,594
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 9, 2022

March 11, 2022

Project location map

Multiple Locations, Lodi, NY


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.