BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 28, 2022 at 7:00 PM

Updated November 15, 2023

Site work and paving for a bridge / tunnel in Stow, Ohio. Conceptual plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

The Steels Corners Bridge over Mud Brook is Summit County's longest bridge, stretching over 1,000 feet. In order to keep the 15-span bridge in good working order, SCE is looking to replace the bridge expansion joints, waterproof the bridge, and resurface with new asphalt. Arcadis, Inc is currently working through the design of these bridge repairs, including determining the best maintenance of traffic plan. Construction is expected in summer/fall 2022. On Steels Corners Road near the State Route 8 interchange on the border of Stow and Cuyahoga Falls. The method of contractor selection has not been determined at this time.

Conceptual

Bridges / Tunnels

$400,000.00

Public - County

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
265
Active Projects
145
Bidding Soon
2,182
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 27, 2023

Project location map

E Steels Corners Rd, Stow, OH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.